Laserfiche WebLink
OCTTR05 2 2 20;6 <br /> ERR/mac DMWON OF PCEC��14N <br /> COLORaDO DI. ,,,-.&.,-,,XTI0N,MINING AND SAFVTY-- <br /> 1313 Sherman Street.Room 1 Denver.Colorado 80203 ph(303)866-3567 <br /> 'IS76 <br /> REQUEST FOR TECILNICAL REVISION'(TR)COVER SHEET n ic <br /> File No.: i`1. 1977-573 Site Name: o <br /> Pueblo West Pit <br /> County Pueblo TR# IDRAfS Use onh•I a ~' <br /> Pennittee:Continental Materials Corporation 0 <br /> Operator(If Other than Peruuttee): <br /> Transit Mix Concrete Co. w <br /> Permrittee Representative:Mr. Brandon Heser, Transit Mix Concrete Co.(719) 313-0316 <br /> Please provide a brief description of the proposed revision: <br /> Request to revise the approved, under performing seed mix with a seed mix better suited to c <br /> m _<. <br /> site conditions. o61 <br /> CU 0 O <br /> As defined by the Minerals Rides,a Technical Revision JR)is: "a change in the penuit or application C) cn 01 <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with detennining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR. <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> detemiirre if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permrittee requests additional time,in writing,to provide the required informration. <br /> There is no pre-defined format for the submittal of a TR-,however, it is up to the permuittee to provide <br /> sufficient information to the Division to approve the TR request,including updated oaring and <br /> reclamation plan wraps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tvve Required TR Fee Submitted(mark only one) <br /> I IOc. 111. 112 construction ❑ <br /> mnatenals.and 112 quarries $216 <br /> 112 hard rock(not Dh4O) $175 ❑ <br /> 110d, 112d(L 2 or 3) $1006 ❑ <br /> 5 <br />