Laserfiche WebLink
Scott Wanstedt <br />Page 2 <br />10/22/2018 <br />Maintenance work conducted during the 2nd quarter included spreading and compacting <br />refuse on 5a; as well as, spreading and compacting the winter refuse stockpile on Pile 5a. <br />Eleven compaction tests were performed this quarter, all of the test results produced <br />proctor values above 90 percent. There were no indications of seepage or any indications <br />of slope failure. The slopes of the piles are stable and only some localized erosion has <br />occurred. The surface drainage facilities are properly conveying surface runoff from the <br />refuse bank areas. <br />This concludes the Division's review of the 2nd Quarter 2018 Professional Certification of <br />the Coal Processing Waste Banks for the Deserado Mine. If you have any questions, <br />please contact me at (303)-866-3567 x 8144 or clayton.wein@state.co.us. <br />Sincerely, <br />A��f/Y(r <br />Clayton Wein <br />Environmental Protection Specialist <br />oF`cOlo <br />555 Street Address, Room 555, Denver, CO 55555.5555 P 555.555.5555 y <br />* 41 <br />} 1876 <br />