Laserfiche WebLink
m <br />NORTH <br />300 0 300 600 900 <br />{ IN FEET ) <br />1 Inch = 300 ft. <br />LEGEND: <br />PERMIT BOUNDARY <br />EXISTING PARCELS <br />EXISTING DITCH CENTERLINE <br />EXISTING 5 FOOT CONTOUR <br />EXISTING 25 FOOT CONTOUR <br />EXISTING MONITORING WELL LOCATION <br />TEMPORARY' TOPSOIL/OVERBURDEN <br />STOCKPILE USED IN CONCURRENT <br />RECLAMATION <br />TOPSOIL/OVtERBURDEN STOCKPILE <br />NOTES: <br />I. THE PROPOSED IRWIN/THOMAS MINE PERMIT AREA IS COMPRISED OF 4 DISTINCT MINING AREAS <br />SEPARATED BY COLORADO HIGHWAY 119, ST. VRAIN CREEK, AND THE BURLINGTON NORTHERN AND <br />SANTA FIE (BNSF) RAILROAD. MINING AREA 1 IS LOCATED SOUTH OF HWY 119, MINING AREA 2 IS <br />NORTH OF HWY 119 AND SOUTH OF ST. VRAIN CREEK, MINING AREA 3 IS NORTH OF ST. VRAIN CREEK <br />AND SOUTH OF THE BNSF RAILROAD, AND MINING AREA 4 IS NORTH OF THE RAILROAD. <br />2. THE PROPOSED PERMIT BOUNDARY ENCOMPASSES APPROXIMATELY 295.6 ACRES WITH ONLY <br />ABOUT 138 ACRES CURRENTLY PLANNED FOR MINING. HOWEVER, THE AFFECTED LAND BOUNDARY <br />ESSENTIALLY FOLLOWS THE PERMIT BOUNDARY TO ALLOW FOR RECLAMATION ACTIVITIES AND <br />FUTURE (POTENTIAL MINING OPERATIONS. <br />3. AREAS NIOT DISTURBED BY MINING MAY BE DISTURBED BY ACCESS ROADS, MATERIAL CONVEYING, <br />STOCKPIILES, OR OTHER MINING RELATED ACTIVITIES. THE REMAINING AREA WILL CONSIST OF <br />SETBACKS AND ROAD AND UTILITY RIGHT-OF-WAYS. <br />4. SETBACKS FROM THE MINE PIT TOP OF SLOPE TO THE PROPOSED PERMIT BOUNDARY OR MAN-MADE <br />STRUCTURES NOT OWNED BY THE APPLICANT WILL BE 50 FEET OR GREATER. <br />5, ITEMS OVNNED BY THE APPLICANT OR PROPERTY OWNER LOCATED WITHIN THE PERMIT AREA SUCH <br />AS UN -IMPROVED ROADS, IRRIGATION LATERALS, FENCES, WATER WELLS AND ASSOCIATED PUMPS, <br />AND OTHIER STRUCTURES MAY BE REMOVED OR RELOCATED DURING MINING AND RECLAMATION. <br />6. TEST PITS HAVE VERIFIED THAT COMMERCIAL DEPOSITS OF SAND AND GRAVEL EXIST UP TO 25 FEET <br />BELOW THE SURFACE OF THE GROUND. <br />7. MINING IS EXPECTED TO ENCOUNTER GROUNDWATER WITHIN FIVE FEET OF THE GROUND SURFACE. <br />THE DEPOSIT WILL BE DRY MINED USING DEWATERING TRENCHES AND PUMPS. <br />8. DURING RAINING ADJACENT TO THE ST. VRAIN CREEK RIPARIAN AREA, PRECAUTIONS WILL BE TAKEN <br />TO NOT DISTURB THE CREEK CHANNEL AND DESIRABLE VEGETATION. <br />9. A MINE OFFICE/SCALE HOUSE TRAILER WILL BE ESTABLISHED NEAR SITE ENTRANCES BOTH NORTH <br />AND SOUTH OF ST. VRAIN CREEK. <br />10. BEST MAINAGEMENT PRACTICES WILL BE USED TO LIMIT DISCHARGE OF STORMWATER AND <br />SEDIMENT ONTO ADJACENT PROPERTIES AND WATERWAYS. <br />MINING SEQUENCE NOTES: <br />1. IN MAI, MINING CELL 1A SHALL BE MINED FIRST. THE SOUTHWEST SIDE OF THE CELL SHALL EXTEND <br />A MINIMUM OF 500 FEET FROM THE ST. VRAIN CREEK PEDESTRIAN PATH. THE CELL SHALL BE MINED <br />AND BACIKFILLED PRIOR TO ADDITIONAL MAI MINING WITHIN THE ST. VRAIN CREEK JURISDICTIONAL <br />100 -YEAR; FLOODPLAIN. MINING AND BACKFILLING OF CELL 1A SHALL OCCUR DURING THE NON -FLOOD <br />PRONE SEASON OF OCTOBER THROUGH APRIL. <br />2. THE SCALE HOUSE AND STAGING AREA IN MAI MAY BE ESTABLISHED ON THE MINED AND BACKFILLED <br />AREA WITHIN CELL IA. <br />3. IN MA2 AND MA3, THE AREAS OF THE MINING CELLS CLOSEST TO ST. VRAIN CREEK SHALL BE MINED <br />FIRST. THE MINE CELL AREAS WITHIN 200 FEET OF THE CREEK SHALL BE MINED AND BACKFILLED <br />DURING THE NON -FLOOD SEASON OF OCTOBER THROUGH APRIL. <br />4. PRIOR TO AFFECTING LAND WITHIN MA2, MA3, OR MA4, THE DIVISION OF RECLAMATION, MINING AND <br />SAFETY (THE DIVISION) SHALL BE NOTIFIED IN WRITING AND APPROPRIATE PERMIT REVISIONS <br />CONSISTENT WITH THE ALTERNATIVE MINING AND RECLAMATION PLANS SHALL BE SUBMITTED FOR <br />APPROVAL. <br />5. IF COMPLETED MINE CELL SIDE SLOPES ARE TO BE WITHIN A RESERVOIR OR POND, THE DIVISION <br />SHALL BE NOTIFIED FOR INSPECTION PRIOR TO FILLING THE RESERVOIR/POND WITH WATER. <br />6. IF SOIL TESTING IS NECESSARY FOR RECLAMATION, TEST RESULTS AND ANY PROPOSED SOIL <br />AMENDMENTS SHALL BE SUBMITTED TO THE DIVISION. <br />7. PRIOR TO MINING IN MA3 AND MA4, MONITORING WELLS SHALL BE INSTALLED AND MONITORED FOR <br />FIVE QUAIRTERS TO ESTABLISH BASELINE GROUNDWATER ELEVATIONS. <br />8. IF OFF-SITE BACKFILL MATERIAL IS TO BE IMPORTED, THE DIVISION SHALL BE NOTIFIED ACCORDING <br />TO THE MIINERAL RULES AND REGULATIONS RULE 3.1.5(9) <br />VEGETATE SIIDE <br />FOR STABILIZATION <br />1' <br />EXISTIN G <br />GROUND <br />18'12' 18' <br />3' <br />TYPICAL BERMING SECTION <br />50' MIN. —►1 I.*— <br />210'-25' <br />AGGREGATE <br />TYPICAL MINING SECTION <br />AT PERMIT BOUNDARY <br />VEGETATE SIDE <br />FOR STABILIZATION <br />sFp 1,9 2018 <br />�4'%1t�}�( p� <br />W41Np I S� M47 -ION <br />MINING <br />HIGHWALL <br />HISTORIC <br />__ 0/—GROUND <br />MIaNING FLOOR <br />cer <br />N.T.S. <br />N.T.S. <br />C <br />0 <br />W <br />Ir <br />0 <br />z <br />W <br />z <br />2 <br />VJ <br />z <br />O <br />..fes. <br />z <br />— <br />N <br />N <br />U o <br />_j w <br />J O <br />o �- <br />o <br />�r�-8 <br />o <br />U)� <br />W [a O <br />U <br />b <br />!n IL LL <br />0 <br />C <br />D <br />.Q <br />U <br />W <br />I— U <br />V t <br />W <br />O� W <br />rD <br />V <br />V) <br />a <br />z <br />z <br />October, 2018 <br />ry <br />590-008 <br />Q <br />C. Snowdon <br />TOP SOIL & z <br />Z <br />OVERBURDEN � � o <br />z � <br />m <br />d.�J <br />1 " = 300' <br />210'-25' <br />AGGREGATE <br />TYPICAL MINING SECTION <br />AT PERMIT BOUNDARY <br />VEGETATE SIDE <br />FOR STABILIZATION <br />sFp 1,9 2018 <br />�4'%1t�}�( p� <br />W41Np I S� M47 -ION <br />MINING <br />HIGHWALL <br />HISTORIC <br />__ 0/—GROUND <br />MIaNING FLOOR <br />cer <br />N.T.S. <br />N.T.S. <br />C <br />0 <br />W <br />Ir <br />0 <br />z <br />W <br />z <br />2 <br />VJ <br />z <br />O <br />..fes. <br />z <br />— <br />N <br />N <br />U o <br />_j w <br />J O <br />o �- <br />o <br />�r�-8 <br />o <br />U)� <br />W [a O <br />U <br />b <br />!n IL LL <br />0 <br />C <br />D <br />.Q <br />U <br />W <br />I— U <br />V t <br />W <br />O� W <br />rD <br />V <br />V) <br />a <br />z <br />z <br />October, 2018 <br />Job No: <br />590-008 <br />_O <br />I— <br />C. Snowdon <br />DeSI n: B. <br />SCHENDERLEIN <br />Checked: B. <br />SCHENDERLEIN <br />n.j <br />1 " = 300' <br />0 <br />0f- <br />Q <br />I- <br />00 <br />W <br />_ <br />N <br />r� <br />W <br />J <br />r� <br />V <br />Z <br />W <br />a <br />®r REvt1ti <br />40 <br />pIVtStN�NiG & SAFETY <br />a° <br />a <br />0 <br />F�- <br />O <br />W <br />0 <br />O <br />00 <br />Date: <br />October, 2018 <br />Job No: <br />590-008 <br />Drawn: <br />C. Snowdon <br />DeSI n: B. <br />SCHENDERLEIN <br />Checked: B. <br />SCHENDERLEIN <br />Scale: <br />1 " = 300' <br />Sheet: <br />4 <br />0f- <br />