Laserfiche WebLink
0'-5' SOIL/OVERBURDEN <br />15-20' <br />SAND/GRAVEL <br />POND RECLAMATION <br />MINING HIGHWALL <br />6" TOP SOIL <br />HISTORIC GROUND <br />HISTORIC GROUND <br />OVERBURDEN BACKFILL <br />3' <br />1' <br />6" TOPSOIL <br />&�, ,-MINING SLOPE <br />N.T.S. <br />MINING HIGHWALL- <br />OVERBURDEN <br />BACKFILL RECLAMATION <br />SURFACE <br />GRADED TO DRAIN <br />4:1 SLOPE TO MEET 4:1 OR SHALLOWER SLOPE <br />GRADE AT TOP OF F WIDTH & GRADIENT VARIES <br />BANK. UPLAND SEED <br />TS <br />SHORELINE/WETLAND RECLAMATION <br />- N.T.S. <br />POND LINER NOTES: <br />1. PRIOR TO CONSTRUCTION, OVERBURDEN AND CLAYSTONE MATERIAL TESTING SHALL BE PERFORMED FOR USE IN FINAL DESIGN. THE FOLLOWING <br />SPECIFICATIONS AND PROCEDURES ARE PROVIDED AS A GENERAL GUIDELINE FOR PERMITTING PURPOSES. FINAL SPECIFICATIONS AND DESIGN <br />CRITERIA WILL BE DEVELOPED DURING THE FINAL DESIGN PROCESS. <br />2. EACH LAYER OF FILL SHALL BE SCARIFIED TO ALLOW PROPER BONDING BETWEEN LAYERS. <br />3. DENSITY AND MOISTURE CONTENT TESTING SHALL BE PERFORMED AT A RATE OF 1 TEST FOR EACH 2,000 YARDS PLACED. <br />4. ALL CLAY LINER MATERIAL SHALL BE COMPACTED TO A MINIMUM 95% ASTM -D698-78 STANDARD PROCTOR AT +2% OF OPTIMUM MOISTURE CONTENT. <br />5. NO LINER MATERIAL SHALL BE PLACED IN THE LINER SLOPE WHILE EITHER THE MATERIAL, EMBANKMENT, OR FOUNDATION IS FROZEN. <br />6. NO ORGANIC MATERIAL SHALL BE PLACED IN THE LINER SLOPE. <br />7. EACH LAYER OR LIFT SHALL BE CONSTRUCTED CONTINUOUSLY AND APPROXIMATELY HORIZONTAL FOR THE WIDTH AND LENGTH OF EACH LIFT. <br />8. LINER MATERIAL SHALL BE COMPOSED OF CLAYEY OVERBURDEN AND WEATHERED CLAYSTONE THAT BREAKS DOWN DURING PROCESSING. <br />BEDROCK CLAYSTONE MATERIAL MAY BE RIPPED, MOISTURE TREATED, AND ALLOWED TO AIR SLAKE FOR A MINIMUM OF ONE DAY PRIOR TO ITS <br />PLACEMENT IN THE LINER. LINER MATERIAL IS DEFINED AS MATERIAL HAVING 4 INCH OR SMALLER COBBLE, A MINIMUM OF 50% FINES BY CLAY <br />WEIGHT PASSING THE US STANDARD 200 SIEVE, AND A PLASTICITY INDEX OF 10% OR GREATER FOR THE PORTION OF MATERIAL FINER THAN THE US <br />STANDARD 40 SIEVE. <br />9. SUFFICIENT MOISTURE SHALL BE ADDED AT THE BORROW AREA SO NO MORE THAN 3% ADDITIONAL MOISTURE IS REQUIRED TO BRING ANY LINER <br />MATERIAL TO SPECIFICATIONS ONCE PLACED IN THE FILL. <br />10.. LINER MATERIAL SHALL BE PLACED IN MAXIMUM OF 9 -INCH LOOSE LIFTS PRIOR TO COMPACTION. <br />11.. A CATERPILLAR 815 OR 825 SHEEPSFOOT COMPACTOR (OR EQUIVALENT) WILL BE USED FOR COMPACTING EFFORTS. <br />12. THE COMPLETED LINER SHALL BE PROTECTED FROM DAMAGE CAUSED BY DESICCATION OR FREEZING TEMPERATURES BY PLACING A MINIMUM OF <br />12 -INCHES PIT RUN MATERIAL ON THE ENTIRE SLOPE. <br />&ON • 0 <br />1pyI <br />300 0 300 600 900 <br />( IN FEET ) <br />1 inch = 300 ft. <br />LEGEND: <br />PERMIT BOUNDARY' <br />MINING HEADWALL <br />PROPOSED HAUL ROAD <br />APPLY WETLAND <br />AVERAGE NORMAL <br />AND UPLAND <br />GROUNDWATER <br />6" TOPSOIL SEED <br />SURFACE <br />rate will be doubled. <br />EXISTING GAS LINE <br />AVERAGE NORMAL <br />EXISTING OVERHEAD ELECTRIC <br />0HE <br />EXISTING EASEMENT <br />WATER SURFACE <br />- - - <br />-- --4880. - <br />4't <br />---4700-- <br />----4700-- <br />Z <br />4880 <br />BACKFILL <br />4700 - <br />0 <br />� J <br />4 <br />a <br />0 <br />SHORELINE WETLAND BENCH <br />SLOPE TO <br />MEET GRADE <br />TS <br />SHORELINE/WETLAND RECLAMATION <br />- N.T.S. <br />POND LINER NOTES: <br />1. PRIOR TO CONSTRUCTION, OVERBURDEN AND CLAYSTONE MATERIAL TESTING SHALL BE PERFORMED FOR USE IN FINAL DESIGN. THE FOLLOWING <br />SPECIFICATIONS AND PROCEDURES ARE PROVIDED AS A GENERAL GUIDELINE FOR PERMITTING PURPOSES. FINAL SPECIFICATIONS AND DESIGN <br />CRITERIA WILL BE DEVELOPED DURING THE FINAL DESIGN PROCESS. <br />2. EACH LAYER OF FILL SHALL BE SCARIFIED TO ALLOW PROPER BONDING BETWEEN LAYERS. <br />3. DENSITY AND MOISTURE CONTENT TESTING SHALL BE PERFORMED AT A RATE OF 1 TEST FOR EACH 2,000 YARDS PLACED. <br />4. ALL CLAY LINER MATERIAL SHALL BE COMPACTED TO A MINIMUM 95% ASTM -D698-78 STANDARD PROCTOR AT +2% OF OPTIMUM MOISTURE CONTENT. <br />5. NO LINER MATERIAL SHALL BE PLACED IN THE LINER SLOPE WHILE EITHER THE MATERIAL, EMBANKMENT, OR FOUNDATION IS FROZEN. <br />6. NO ORGANIC MATERIAL SHALL BE PLACED IN THE LINER SLOPE. <br />7. EACH LAYER OR LIFT SHALL BE CONSTRUCTED CONTINUOUSLY AND APPROXIMATELY HORIZONTAL FOR THE WIDTH AND LENGTH OF EACH LIFT. <br />8. LINER MATERIAL SHALL BE COMPOSED OF CLAYEY OVERBURDEN AND WEATHERED CLAYSTONE THAT BREAKS DOWN DURING PROCESSING. <br />BEDROCK CLAYSTONE MATERIAL MAY BE RIPPED, MOISTURE TREATED, AND ALLOWED TO AIR SLAKE FOR A MINIMUM OF ONE DAY PRIOR TO ITS <br />PLACEMENT IN THE LINER. LINER MATERIAL IS DEFINED AS MATERIAL HAVING 4 INCH OR SMALLER COBBLE, A MINIMUM OF 50% FINES BY CLAY <br />WEIGHT PASSING THE US STANDARD 200 SIEVE, AND A PLASTICITY INDEX OF 10% OR GREATER FOR THE PORTION OF MATERIAL FINER THAN THE US <br />STANDARD 40 SIEVE. <br />9. SUFFICIENT MOISTURE SHALL BE ADDED AT THE BORROW AREA SO NO MORE THAN 3% ADDITIONAL MOISTURE IS REQUIRED TO BRING ANY LINER <br />MATERIAL TO SPECIFICATIONS ONCE PLACED IN THE FILL. <br />10.. LINER MATERIAL SHALL BE PLACED IN MAXIMUM OF 9 -INCH LOOSE LIFTS PRIOR TO COMPACTION. <br />11.. A CATERPILLAR 815 OR 825 SHEEPSFOOT COMPACTOR (OR EQUIVALENT) WILL BE USED FOR COMPACTING EFFORTS. <br />12. THE COMPLETED LINER SHALL BE PROTECTED FROM DAMAGE CAUSED BY DESICCATION OR FREEZING TEMPERATURES BY PLACING A MINIMUM OF <br />12 -INCHES PIT RUN MATERIAL ON THE ENTIRE SLOPE. <br />&ON • 0 <br />1pyI <br />300 0 300 600 900 <br />( IN FEET ) <br />1 inch = 300 ft. <br />LEGEND: <br />PERMIT BOUNDARY' <br />-- <br />PROPOSED HAUL ROAD <br />Blue Grama - ------ <br />Alfalfa <br />PROPOSED MINING LIMITS <br />TOTAL <br />EXISTING PARCELS <br />*Application rate is for drill seeding. <br />EXISTING DITCH <br />rate will be doubled. <br />EXISTING GAS LINE <br />GAS - - <br />EXISTING OVERHEAD ELECTRIC <br />0HE <br />EXISTING EASEMENT <br />- - - - - - - <br />EXISTING 5 FOOT CONTOUR <br />-- --4880. - <br />EXISTING 25 FOOT CONTOUR <br />---4700-- <br />----4700-- <br />PROPOSED 5 FOOT CONTOUR <br />PROPOSED <br />4880 <br />PROPOSED 25 FOOT CONTOUR <br />4700 - <br />INCITES: <br />1. THE PROPOSED FINAL LAND USE FOR THE IRWIN/THOMAS MINE IS GENERAL AGRICULTURE. <br />2. RECLAMATION PLAN MAP ILLUSTRATES CONDITIONS WHEN ADEQUATE QUANTITIES OF <br />OFF-SITE BACKFILL MATERIAL IS AVAILABLE AND A PERMANENT SOURCE OF WATER FOR <br />LONG-TERM AUGMENTATION OF EXPOSED GROUNDWATER HAS BEEN OBTAINED. MINE <br />CELLS WILL BE BACKFILLED TO CREATE UPLAND, PONDS, AND WETLAND AREAS. <br />3. ALL SLOPES SHALL BE GRADED TO 3H:1V OR FLATTER. ROUGH GRADING WILL ESTABLISH <br />FINAL ELEVATIONS, SLOPES, AND TRANSITIONS. TRANSITIONS BETWEEN UPLANDS, <br />WETLANDS, AND POND SLOPES SHALL BE GRADED WITH A SMOOTH, GRADUAL <br />TOPOGRAPHY. <br />4. FINAL GRADING WILL INCLUDE ADDITION OF TOPSOIL AND SURFACE PREPARATION FOR <br />REVEGETATION. SPECIAL ATTENTION SHALL BE GIVEN TO TRANSITIONS FROM RECLAIMED <br />AREAS TO UNDISTURBED LAND. <br />5, ALL AVAILABLE TOPSOIL AND OVERBURDEN MATERIAL WILL BE USED FOR BACKFILLING <br />AND RECLAMATION. <br />6. THE GROWTH MEDIUM FOR REVEGETATION WILL BE A COMBINATION OF OVERBURDEN AND <br />TOPSOILS. <br />7. TWO DIFFERENT MIXES OF UPLAND GRASSES WILL BE USED IN AREAS THAT WILL NOT <br />EXPERIENCE PERIODIC FLOODING, SEASONAL GROUNDWATER, OR OTHER MOIST SOIL <br />CONDITIONS. ONE SEED MIX WILL BE USED SIMPLY FOR QUICK SOIL STABILIZATION AND <br />EROSION CONTROL. THIS MIX WILL MAINLY BE USED IN MA1 WHERE FURTHER <br />AGRICULTURAL OR OTHER DEVELOPMENT IS EXPECTED TO OCCUR FOLLOWING PERMIT <br />RELEASE. THE SECOND GRASS SEED MIX FOR AREAS LEFT AS OPEN SPACE IS COMPOSED <br />OF A LONG LASTING AND REGENERATING NATIVE UPLAND SEED MIXTURE. <br />Application Rate <br />Upland Grass Seed - Soil Stabilization (#PLS/acre) <br />Intermediate Wheatgrass <br />3 <br />-0.75 <br />Blue Grama - ------ <br />Alfalfa <br />_ -_ <br />0.75 <br />TOTAL <br />4.5 <br />*Application rate is for drill seeding. <br />If seed is to be broadcast, the application <br />rate will be doubled. <br />-_ <br />Application Rate* <br />Upland Grass Seed - Native Open Space (#PLS/acre) <br />Western Wheatgrass <br />4 <br />Blue grama <br />I <br />Side -oats grama <br />- 1.5 <br />Sand dropseed <br />- 0.5 _- <br />Switchgrass <br />- _ <br />I <br />Indian Rice_grass _ _ <br />TO_TA_ L --------- <br />- _ 1 <br />--� - - 9 -- - - <br />*Application rate is for drill seeding. <br />rate will be doubled. <br />If seed is to be broadcast, the application <br />_ <br />8. IN AREAS WHERE WETLANDS COULD POTENTIALLY BE DEVELOPED, THE SEED MIX WILL BE <br />MODIFIED TO INCLUDE MORE TRANSITION AND WETLAND GRASSES AND GRASS -LIKE <br />SPECIES. THESE SEED MIXES, ESPECIALLY IF STANDING WATER OR SATURATED SOILS <br />EXIST DURING PLANTING, WILL LIKELY NEED TO BE BROADCAST. <br />Grass Seed <br />Application Rate <br />(#PLS/acre) <br />2.5 <br />2.5 <br />1.5 <br />1.5 <br />1.5 <br />1.5 <br />- 11 <br />eeding. If seed is to be broadcast, the application <br />9. UPLAND GRASS SEED WILL BE PLANTED WITH A DRILL EQUIPPED WITH DEPTH BANDS AND <br />PRESS WHEELS. THE SEEDED AREA WILL THEN BE COVERED WITH CERTIFIED WEED -LESS <br />STRAW'MULCH AT A RATE OF 2,000 POUNDS PER ACRE. THE STRAW WILL BE CRIMPED INTO <br />THE SOIL TO CONTROL EROSION UNTIL THE GRASS BECOMES ESTABLISHED. <br />10. DRILL SEEDING IS THE PREFERRED METHOD FOR REVEGETATION. IF BROADCAST <br />SEEDING IS NECESSARY ON MOIST SOILS, STEEP SLOPES, OR IN EXCESSIVELY ROCKY <br />AREAS, SUCCESS CAN BE ENCOURAGED BY BROADCASTING ONTO GROWTH MEDIUM THAT <br />IS VERY LOOSE. IF THE SEED IS BROADCAST IN THOSE CIRCUMSTANCES, THEN THE <br />SEEDED AREA WILL BE DRAGGED TO HELP BURY THE SEED. <br />11. PERIODIC INSPECTION FOR NOXIOUS WEEDS, AT LEAST ONCE A YEAR EARLY IN THE <br />SEASON, WILL BE DONE AS PART OF A WEED MANAGEMENT PLAN. <br />12. THE MINE OFFICE/SCALE HOUSE TRAILER AND ANY OTHER STRUCTURES ASSOCIATED <br />WITH MINING WILL BE REMOVED FROM THE SITE DURING FINAL RECLAMATION ACTIVITIES. <br />13. BEST MANAGEMENT PRACTICES WILL BE USED TO CONTROL EROSION AND STORMWATER <br />SUSPENDED SEDIMENT RUNOFF FROM THE SITE DURING RECLAMATION ACTIVITIES. <br />CALL UTILITY NOTIFICATION CENTER OF <br />COLORADO <br />y, . <br />SPP X018 <br />Know what's below. <br />Call before you dig. [)rjISIOtjOF RECLAMATION <br />CALL 2 BUSINESS DAYS IN ADVANCE BEFORE MINING & SAFETY <br />YOU DIG, GRADE, OR EXCAVATE FOR THE <br />MARKING OF UNDERGROUND MEMBER UTILITIES. <br />4-1 <br />0 <br />0 <br />6 <br />C <br />0 <br />(D <br />W <br />Z <br />O_ <br />Q <br />U <br />J <br />CL <br />Q <br />C_ <br />G <br />W <br />N <br />r <br />L.L <br />J <br />W <br />W <br />a <br />z <br />Q <br />CL <br />z <br />0 <br />Date: October, 2018 <br />Job No: 590-008 <br />Drawn: C. Snowdon <br />Design: B. SCHENDERLEIN <br />Checked: B. SCHENDERLEIN <br />Scale: 1 " = 200' <br />Sheet: <br />4 of:4 <br />N <br />N <br />LO <br />J C) <br />(0J <br />O <br />Q O <br />o <br />ONU <br />U)N c <br />w m° p <br />CJ <br />(1)o Q <br />00 0- L <br />Z <br />C <br />J <br />0 <br />Z <br />i <br />a <br />0 <br />_.i <br />W <br />U <br />C <br />z- <br />O <br />C.) <br />_ <br />W <br />9 <br />� <br />� <br />o <br />o <br />Q <br />r <br />U <br />o <br />V <br />W <br />u, <br />z <br />= <br />Ur <br />W <br />O <br />z <br />W <br />QU <br />o <br />O <br />0 <br />m <br />- <br />Z <br />Z <br />O_ <br />Q <br />U <br />J <br />CL <br />Q <br />C_ <br />G <br />W <br />N <br />r <br />L.L <br />J <br />W <br />W <br />a <br />z <br />Q <br />CL <br />z <br />0 <br />Date: October, 2018 <br />Job No: 590-008 <br />Drawn: C. Snowdon <br />Design: B. SCHENDERLEIN <br />Checked: B. SCHENDERLEIN <br />Scale: 1 " = 200' <br />Sheet: <br />4 of:4 <br />