0'-5' SOIL/OVERBURDEN <br />15'-20' <br />SAND/GRAVEL <br />HISTORIC GROUND <br />OVERBURDEN BACKFILL <br />/..►%:. 3' - MINING SLOPE <br />016 -VU <br />V 12" TOPSOIL <br />POND RECLAMATION <br />N.T.S. <br />4:1 SLOPE TO MEET <br />4:1 OR SHALLOWER SLOPE <br />GRADE AT TOP OF <br />WIDTH & GRADIENT VARIIES <br />BANK. UPLAND SEED <br />m <br />MINING HEADWALL <br />FEET ) <br />Western Wheatgrass <br />APPLY WETLAND <br />= 300 ft. <br />AND UPLAND <br />LEGEND: <br />12" TOPSOIL SEED <br />__ <br />Sand dropseed - <br />AVERAGE NORMAL <br />Switchgrass <br />1 <br />PROPOSED HAUL ROAD <br />WATER SURFACE <br />[TOTAL _------------- - -- -- <br />_ --_------�- -- 9 <br />*Application rate is for drill seeding. If seed is to be broadcast, the application <br />rate will be doubled. <br />4't <br />W <br />cri <br />_ <br />BACKFILL <br />c <br />EXISTING PARCELS <br />.� <br />Z <br />O <br />•0 <br />SHORELINE <br />� <br />Q <br />J <br />EXISTING DITCH <br />WETLAND BENCH low <br />SHORELINE/WETLAND RECLAMATION <br />SLOPE TO <br />MEET GRADE <br />N.T.S. <br />POND LINER NOTES: <br />1. PRIOR TO CONSTRUCTION, OVERBURDEN AND CLAYSTONE MATERIAL TESTING SHALL BE PERFORMED FOR UISE IN FINAL DESIGN. THE FOLLOWING <br />SPECIFICATIONS AND PROCEDURES ARE PROVIDED ASA GENERAL GUIDELINE FOR PERMITTING PURPOSES. FINAL SPECIFICATIONS AND DESIGN <br />CRITERIA WILL BE DEVELOPED DURING THE FINAL DESIGN PROCESS. <br />2. EACH LAYER OF FILL SHALL BE SCARIFIED TO ALLOW PROPER BONDING BETWEEN LAYERS. <br />3. DENSITY AND MOISTURE CONTENT TESTING SHALL BE PERFORMED AT A RATE OF 1 TEST FOR EACH 2,000 YARDS PLACED. <br />4. ALL CLAY LINER MATERIAL SHALL BE COMPACTED TO A MINIMUM 95% ASTM -13698-78 STANDARD PROCTOR AT ±2% OF OPTIMUM MOISTURE CONTENT. <br />5. NO LINER MATERIAL SHALL BE PLACED IN THE LINER SLOPE WHILE EITHER THE MATERIAL, EMBANKMENT, OR FOUNDATION IS FROZEN. <br />6. NO ORGANIC MATERIAL SHALL BE PLACED IN THE LINER SLOPE. <br />7. EACH LAYER OR LIFT SHALL BE CONSTRUCTED CONTINUOUSLY AND APPROXIMATELY HORIZONTAL FOR THE WIDTH AND LENGTH OF EACH pFT. <br />8. LINER MATERIAL SHALL BE COMPOSED OF CLAYEY OVERBURDEN AND WEATHERED CLAYSTONE THAT BREAKS DOWN DURING PROCESSING. <br />BEDROCK CLAYSTONE MATERIAL MAY BE RIPPED, MOISTURE TREATED, AND ALLOWED TO AIR SLAKE FOR A MINIMUM OF ONE DAY PRIOR TQ ITS <br />PLACEMENT IN THE LINER. LINER MATERIAL IS DEFINED AS MATERIAL HAVING 4 INCH OR SMALLER COBBLE, A, MINIMUM OF 50% FINES BY CLAY <br />WEIGHT PASSING THE US STANDARD 200 SIEVE, AND A PLASTICITY INDEX OF 10% OR GREATER FOR THE PORTION OF MATERIAL FINER THA THE US <br />STANDARD 40 SIEVE. <br />9. SUFFICIENT MOISTURE SHALL BE ADDED AT THE BORROW AREA SO NO MORE THAN 3% ADDITIONAL MOISTURE IS REQUIRED TO BRING ANY LINER <br />MATERIAL TO SPECIFICATIONS ONCE PLACED IN THE FILL. <br />10. LINER MATERIAL SHALL BE PLACED IN MAXIMUM OF 9 -INCH LOOSE LIFTS PRIOR TO COMPACTION. <br />11. A CATERPILLAR 815 OR 825 SHEEPSFOOT COMPACTOR (OR EQUIVALENT) WILL BE USED FOR COMPACTING EFFORTS. <br />12. THE COMPLETED LINER SHALL BE PROTECTED FROM DAMAGE CAUSED BY DESICCATION OR FREEZING TEMPERATURES BY PLACING A MINIMUM OF <br />12 -INCHES PIT RUN MATERIAL ON THE ENTIRE SLOPE. <br />(9 1 NORTH 0 <br />0 <br />0 <br />300 0 <br />300 600 900 <br />y <br />- -- - ----0.75 -- --- <br />T TAL 4.5 <br />_ _ _ _ _ _ <br />*Application rate is for drill seeding. If seed is to be broadcast, the application <br />rate will be doubled. <br />m <br />( IN <br />FEET ) <br />Western Wheatgrass <br />1 inch <br />= 300 ft. <br />1 <br />LEGEND: <br />1.5 <br />__ <br />Sand dropseed - <br />PERMIT BOUNDARY <br />Switchgrass <br />1 <br />PROPOSED HAUL ROAD <br />- - - - - - - <br />[TOTAL _------------- - -- -- <br />_ --_------�- -- 9 <br />*Application rate is for drill seeding. If seed is to be broadcast, the application <br />rate will be doubled. <br />PROPOSED MINING LIMITS <br />W <br />cri <br />_ <br />m <br />c <br />EXISTING PARCELS <br />.� <br />Z <br />O <br />•0 <br />�.- <br />U) <br />� <br />Q <br />J <br />EXISTING DITCH <br />•� <br />J <br />C) <br />EXISTING GAS LINE <br />GAS - - <br />J <br />EXISTING OVERHEAD ELECTRIC <br />oHE <br />U <br />EXISTING EASEMENT <br />- - - - - - - <br />w <br />EXISTING 5 FOOT CONTOUR <br />--------4880-- <br />----4880-- <br />EXISTING, <br />EXISTING 25 FOOT CONTOUR <br />----4700-- <br />---4700-- <br />PROPOSED <br />PROPOSED 5 FOOT CONTOUR <br />4880 <br />PROPOSED 25 FOOT CONTOUR <br />---4700-- <br />o <br />Z <br />NOTES: <br />1. THE PROPOSED FINAL LAND USE FOR THE IRWIN/THOMAS MINE IS GENERAL AGRICULTURE. <br />2. RECLAMATION PLAN MAP ILLUSTRATES CONDITIONS WHEN ADEQUATE QUANTITIES OF <br />OFF-SITE BACKFILL MATERIAL IS NOT AVAILABLE BUT A PERMANENT SOURCE OF WATER <br />FOR LONG-TERM AUGMENTATION OF EXPOSED GROUNDWATER HAS BEEN OBTAINED. <br />MINE CELLS WILL BE BACKFILLED TO CREATE OPEN WATER PONDS AND LIMITED WETLAND <br />AREAS. <br />3. IF ADEQUATE QUANTITIES OF OFF-SITE BACKFILL ARE NOT AVAILABLE, MINING WILL NOT <br />PROGRESS INTO MA3 OR MA4..AND EXISTING CONDITIONS WILL REMAIN UNDISTURBED. <br />4. ALL SLOPES SHALL BE GRADED TO 3H:1 V OR FLATTER. SLOPES WITHIN THE ST. VRAIN <br />CREEK DELINEATED 100 -YEAR FLOODPLAIN SHALL BE GRADED TO 4H:1V OR FLATTER. <br />ROUGH GRADING WILL ESTABLISH FINAL ELEVATIONS, SLOPES, AND TRANSITIONS. <br />TRANSITIONS BETWEEN UPLANDS, WETLANDS, AND POND SLOPES SHALL BE GRADED WITH <br />A SMOOTH, GRADUAL TOPOGRAPHY. <br />5. FINAL GRADING WILL INCLUDE ADDITION OF TOPSOIL AND SURFACE PREPARATION FOR <br />REVEGETATION. SPECIAL ATTENTION SHALL BE GIVEN TO TRANSITIONS FROM RECLAIMED <br />AREAS TO UNDISTURBED LAND. <br />6. ALL AVAILABLE TOPSOIL AND OVERBURDEN MATERIAL WILL BE USED FOR BACKFILLING <br />AND RECLAMATION. <br />7. THE GROWTH MEDIUM FOR REVEGETATION WILL BE A COMBINATION OF OVERBURDEN AND <br />TOPSOILS. <br />8. TWO DIFFERENT MIXES OF UPLAND GRASSES WILL BE USED IN AREAS THAT WILL NOT <br />EXPERIENCE PERIODIC FLOODING, SEASONAL GROUNDWATER, OR OTHER MOIST SOIL <br />CONDITIONS. ONE SEED MIX WILL BE USED SIMPLY FOR QUICK SOIL STABILIZATION AND <br />EROSION CONTROL. THIS MIX WILL MAINLY BE USED IN MA1 WHERE FURTHER <br />AGRICULTURAL OR OTHER DEVELOPMENT IS EXPECTED TO OCCUR FOLLOWING PERMIT <br />RELEASE. THE SECOND GRASS SEED MIX FOR AREAS LEFT AS OPEN SPACE IN MA2 IS <br />COMPOSED OF A LONG LASTING AND REGENERATING NATIVE UPLAND SEED MIXTURE. <br />Upland Grass Seed - Soil Stabilization <br />Application Rate* <br />(#PLS/acre) <br />rmediate Wheatgrass 3 <br />Grama 0.75lfa <br />F <br />- -- - ----0.75 -- --- <br />T TAL 4.5 <br />_ _ _ _ _ _ <br />*Application rate is for drill seeding. If seed is to be broadcast, the application <br />rate will be doubled. <br />- - - - - - - - <br />Upland Grass Seed - Native Open Space <br />Application Rate* <br />(#PLS/acre) <br />Western Wheatgrass <br />4 <br />Blue grama <br />1 <br />Side -oats grama - -- <br />1.5 <br />__ <br />Sand dropseed - <br />__ <br />0.5 <br />Switchgrass <br />1 <br />Indian Ricegrass <br />1 <br />[TOTAL _------------- - -- -- <br />_ --_------�- -- 9 <br />*Application rate is for drill seeding. If seed is to be broadcast, the application <br />rate will be doubled. <br />9. IN AREAS WHERE WETLANDS COULD POTENTIALLY BE DEVELOPED, THE SEED MIX WILL BE <br />MODIFIED TO INCLUDE MORE TRANSITION AND WETLAND GRASSES AND GRASS -LIKE <br />SPECIES. THESE SEED MIXES, ESPECIALLY IF STANDING WATER OR SATURATED SOILS <br />EXIST DURING PLANTING, WILL LIKELY NEED TO BE BROADCAST. <br />Wetland/Transition Grass Seed <br />_ - - -_ <br />October, 2018 <br />Application Rate* <br />(#PLS/acre} <br />_ <br />Western Wheatgrass <br />2.5 <br />Switchgrass- <br />2.5 - <br />Bottlebrush squirreltail <br />1.5 <br />Alkali sacaton <br />_ <br />1.5 <br />Colorado rush _ <br />1.5_ <br />Meadow sedge- - - - ----- <br />TOTAL -- <br />*Application rate is for drill seeding. <br />rate will be doubled. <br />_ <br />---- -- - 1.5 <br />-- 1 �---------- <br />If seed is to be broadcast, the application <br />- <br />10. UPLAND GRASS SEED WILL BE PLANTED WITH A DRILL EQUIPPED WITH DEPTH BANDS AND <br />PRESS WHEELS. THE SEEDED AREA WILL THEN BE COVERED WITH CERTIFIED WEED -LESS <br />STRAW MULCH AT A RATE OF 2,000 POUNDS PER ACRE. THE STRAW WILL BE CRIMPED INTO <br />THE SOIL TO CONTROL EROSION UNTIL THE GRASS BECOMES ESTABLISHED. <br />11. DRILL SEEDING IS THE PREFERRED METHOD FOR REVEGETATION. IF BROADCAST <br />SEEDING IS NECESSARY ON MOIST SOILS, STEEP SLOPES, OR IN EXCESSIVELY ROCKY <br />AREAS, SUCCESS CAN BE ENCOURAGED BY BROADCASTING ONTO GROWTH MEDIUM THAT <br />IS VERY LOOSE. IF THE SEED IS BROADCAST IN THOSE CIRCUMSTANCES, THEN THE <br />SEEDED AREA WILL BE DRAGGED TO HELP BURY THE SEED, <br />12. PERIODIC INSPECTION FOR NOXIOUS WEEDS, AT LEAST ONCE A YEAR EARLY IN THE <br />SEASON, WILL BE DONE AS PART OF A WEED MANAGEMENT PLAN. <br />13. THE MINE OFFICE/SCALE HOUSE TRAILER AND ANY OTHER STRUCTURES ASSOCIATED <br />WITH MINING WILL BE REMOVED FROM THE SITE DURING FINAL RECLAMATION ACTIVITIES. <br />14. BEST MANAGEMENT PRACTICES WILL BE USED TO CONTROL EROSION AND STORMWATER <br />SLASPENDED SEDIMENT RUNOFF FROM THE SITE DURING RECLAMATION ACTIVITIES. <br />�Q CALL UTILITY NOTIFICATION CENTER OF <br />7 COLORADO <br />/O, <br />N�C • <br />Know what's below. <br />Cal before you dig. <br />CALL 2 BUSINESS DAYS IN ADVANCE BEFORE <br />YOU DIG, GRADE, OR EXCAVATE FOR THE <br />MARKING OF UNDERGROUND MEMBER UTILITIES. <br />N <br />U o <br />CD <br />0 <br />c <br />0 _L <br />0 <br />►~ t� <br />0N <br />-CN c <br />LU m0 <br />�O <br />m m U_ <br />W <br />October, 2018 <br />C.3 <br />C_ <br />590-008 <br />Z <br />a <br />- <br />O <br />G <br />W <br />Scale: <br />Z <br />U) ii <br />��,► <br />�, <br />Q <br />U <br />3 <br />O <br />J <br />O <br />G <br />V <br />> <br />O <br />WU) <br />W <br />Z <br />_ <br />m <br />I..L. <br />O <br />.� <br />Z <br />r ,1 <br />`.J <br />�.- <br />U) <br />� <br />Q <br />J <br />0 <br />m <br />J <br />C) <br />J <br />Z <br />Z <br />October, 2018 <br />�- <br />590-008 <br />Drawn: <br />a <br />F- <br />< <br />SCHENDERLEIN <br />� <br />SCHENDERLEIN <br />Scale: <br />Z <br />J <br />a <br />N <br />a <br />� <br />J <br />LL <br />CL <br />� <br />�- <br />z <br />W <br />m <br />o <br />ri <br />N <br />r <br />J <br />J <br />:D <br />U <br />w <br />Date: <br />October, 2018 <br />Job No: <br />590-008 <br />Drawn: <br />C. Snowdon <br />Design: B. <br />SCHENDERLEIN <br />Checked: B. <br />SCHENDERLEIN <br />Scale: <br />1 " = 200' <br />Sheet: <br />2 <br />Of: <br />