Laserfiche WebLink
Ms.Amy Eschberger <br /> RE: Irwin/Thomas Mine M-2016-054 <br /> October 16, 2018 <br /> g. The only structure proposed for area MA1 is the scale house. The scale and scale house <br /> will be portable and will not require demolition. No sealed ditches, culverts, paved roads <br /> or other permanent infrastructure requiring demolition during reclamation will be created <br /> during the mining operation. <br /> 6.4.19 Exhibit S— Permanent Man-Made Structures <br /> 4. The occupant and structure owner— Smith, Clifford E Estate Et Al.—was located at the same <br /> residential address as Smith, Kathryn D Et Al. Notices were initially sent to both occupant <br /> names at the address and both were signed for by Kathryn Smith. Therefore, the structure <br /> agreement was only sent to Kathryn Smith. <br /> A structure agreement offer was more recently sent to — Smith, Clifford E Estate Et Al — at <br /> the residential address by certified mail receipt. Proof of mailing is provided in <br /> Attachment C. <br /> If you have any questions regarding this application and adequacy comment responses, please <br /> call me directly at(970) 227-2803. <br /> Sincerely, <br /> Blue Earth Solutions, LLC <br /> William Schenderlein, P.E. <br /> Project Manager <br /> Enclosures <br /> Page 3 of 3 <br />