Laserfiche WebLink
Kn i ht Piesold Table3.1 <br /> 9Cripple Creek and Victor Gold Mining Co.(Newmont) <br /> C O N S U L T I N G Cripple Creek and Victor Mine <br /> Stormwater Management Plan Evaluation <br /> Summary of Modified SWMP Evaluation Findings <br /> Impoundment Spillway Inflow Diversion Channel <br /> Required Weir Required Chute As-built <br /> Required Volume: As-built Weir As-built Chute As-built Riprap Required Riprap Required Peak As-built Riprap Required Riprap <br /> EMP As-built Volume U SpillwayPeak Flow: Peak Flow:Upgrades Upgrades Channel Flow Upgrades <br /> 2x 10yr/24hr RunoffFlow Capacity Flow Capacity Stability Stability Flow: 100yr/24hr Stability Stability <br /> (fts) ( 3) required? exists? ) 100yr/24hr ( ) 100yr/24hr y y required? Exists? Capacity ( ) y y required? <br /> ft (cfs (cfs) cfs (cfs) Factor of Safety Factor of Safety (cfs) cfs Factor of Safety Factor of Safet <br /> • 126,587 Yes Yes170 39 No NA NA NA NA NA <br /> • chute NA1.2 Yes <br /> 560,736 501,995 NoYes 0 �241.3 12 300 131 0 <br /> 8c 163,690 111,433(') No Yes 42 29 153 29 1.4 1.2 No No NA NA NA NA NA <br /> 9a-d(combined) 270,351 99,863(61 No •. • No NA NA NA NA NA <br /> 11 286,146 214,967(7� No(') No NA NA NA NA NA NA No No NA NA NA NA NA <br /> 250 57 <br /> 16 167,265 21.930 No 25 4 111 36 • - `. 2.7 1.2 - <br /> 34 30 50 1.9 1.2 111 36 • <br /> 17, 17a, 17b 526,446 193,518 No <br /> (combined) • 30 10 65 4.6 1.2 Yes 39 9 4.1 1.2 No <br /> • • No NA NA NA 18 199,631 157,385 No • - • 1033120 320,145 67,494 No21 89,235 66,551 No • No NA NA NAONA <br /> NA NA <br /> .•: • • No NA NA NA NA NA <br /> • •- .- No NA NA NA NA NA NA No No NA NA NA NA NA <br /> Notes: <br /> 1. Red shading denotes structures that require upgrades. <br /> 2.Green shading denotes structures that do not require upgrades. <br /> 3. EMP 6:The existing spillway chute appears to lose containment near the outlet. Upgrades will be required regardless to extend the chute to the second,expanded EMP 6 pond.A second spillway design is included to discharge from the second EMP 6 pond to the environment. <br /> 4. EMP 8a:A new diversion channel (DC-EMP8a)was designed to EMP 8a that will divert part of the existing EMP 9a-d contributing area.The required volume accounts for the new diversion channel(DC-EMP8a). <br /> 5. EMP 8c:The required volume accounts for the reduced area due to the Squaw Gulch VLF 2 expansion. <br /> 6. EMP 9a-d:The required volume accounts for the reduced area due to the new diversion channel (DC-EMP8a)that will divert part of the existing EMP 9a-d contributing area to EMP 8a. Four(4)spillways designs are required. <br /> 7. EMP 11: Reclassified as a'non-EMP'structure, per CC&V.The as-built volume is sufficient to store the runoff volume from a single 10-year/24-hour storm event,as shown in the'Required Volume'column for this EMP. Upgrades(including spillway)and further analyses not required. <br />