My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-19_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2018-10-19_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:18:05 AM
Creation date
10/19/2018 4:32:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/19/2018
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR101
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Knight M sold <br /> CONSULTING Table2.5 <br /> Cripple Creek and Victor Gold Mining Co.(Newmont) <br /> Cripple Creek and Victor Mine <br /> Stormwater Management Plan Evaluation <br /> Existing Spillway Inlet Weirs 100-year/24-hour Storm Event Evaluation <br /> Parameter S pillway Inlet Weirs <br /> EMP6 Weir clkm :. EMPBc Weir EMP16 Weir EMP17a Weir EMP17b Weir t <br /> As-built bottom width ft , Bf 15.5 12.0 15.0 4.1 8.8 2.1 1.7 <br /> As-built side-slope xH:i V ,Z 4.8 2.0 2.0 2.8 3.4 2.1 4.7 <br /> As-built channel depth ft , Dc 3.1 2.0 2.0 2.3 2.1 2.1 1.4 <br /> As-built freeboard depth ft , Dfb 1.0 1.0 1.0 1.0 1.0 1.0 1.0 <br /> As-built allowable normal flow depth ft , Dn 2.1 1.0 1.0 1.3 1.1 1.9 0.4 <br /> As-built flow capacity cfs , Qab 170 34 1 42 25 34 30 2 <br /> 1 00 ear/24-hour flow rate cfs Q100/24 39 118 29 4 30 10 13 <br /> Ca acit Sufficient or Insufficient I Sufficient Sufficient Sufficient Sufficient Sufficient <br /> Notes: <br /> 1. Capacity is deemed sufficient if the as-built flow capacity is equal to or greater than the 100-year/24-hour flow rate. Otherwise, insufficient. <br /> 2. The spillways for EMP9a and EMP22 were found to have depths less than 1.0 foot. Because this is less than the required freeboard,these spillways were not evaluated <br /> and will be redesigned during the next stage of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.