Laserfiche WebLink
a <br /> 6 (FormAlf illf013113601. fbi BRMS Use <br /> 3: Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> elation. Specify approximate topsoil redistribu ion deff the <br /> ( ' - 1• Pil <br /> �'► to : l <br /> t�%ll rd�i erzvi , <br /> 4. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> 5. Describe how portals,adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> 1 % <br /> 1 I,)^, <br /> 6. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> bo 9i4j, apen4i i <br /> Wn <br /> -Greta :2 <br />