My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-16_PERMIT FILE - M2018039 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018039
>
2018-10-16_PERMIT FILE - M2018039 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:14:19 AM
Creation date
10/16/2018 1:47:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018039
IBM Index Class Name
PERMIT FILE
Doc Date
10/16/2018
Doc Name
Adequacy Review Response
From
Blue Earth Solutions
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> TRI-DISTRICTS TREIBER B RESERVOIR <br /> Summary of Seepage Analyses <br /> Hydraulic Conductivity Bedrock Liner Modeled Seepage State Engineer <br /> Station Key Depth Height Allowable Seepage <br /> (cm/s) 0t) �) (f[�/day)Per LF (ft/day per LF) <br /> Overburden 1.Ox 10-6 <br /> Sand and Gravel 1.Ox10-Z <br /> Sta. 39-00 Shale Bedrock 1.Ox10-' 4 35 0.28 1.05 <br /> Slurry Wall 1.Ox10-6 <br /> Sta. 13+00 Overburden 1.Ox10-6 <br /> (Treiber A Sand and Gravel 1.Ox 10 2 3 34 0.32 1.02 <br /> Alignment) Shale Bedrock 1.Ox10 <br /> Slurry Wall I.Ox10 <br /> 1. State Engineer's allowable seepage rate(Design Standard)through typical maximum cross-section for each pond analyzed is <br /> obtained by multiplying allowable seepage rate of 0.03 ft3/day/ftz of liner by the height of the liner(ground surface to <br /> bottom of key). <br /> P\91322\I33-91322-15001\Docs\Reports\Geotech\Tables\Table 2 Treiber B Summary of Seepage Analyses rev.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.