Laserfiche WebLink
Table E-2 Reclamation Timetable <br /> Task Description Reclamation Time <br /> 1 Mine Area 1(mined out) 0 Years <br /> 2 Mine Area 2, reclaim portions of Area 1 8 Years <br /> 3 Mine Area 3,reclaim Area 2 10 Years <br /> 4 Mine Area 4, reclaim Area 3 14 Years <br /> 5 Mine Area 5,reclaim Area 4 13 Years <br /> 6 Mine Area 6, reclaim Area 5 13 Years <br /> 7 Mine Area 7,reclaim Area 6 8 Years <br /> 8 Reclaim Area 7 and Processing Area 1 Years <br /> Total 67 Years <br /> 3. Revegetation Plan <br /> For each area of reclamation, soil will be disked to loosen the soil. Due to the mild grade, seed <br /> can be drilled in both regions; broadcast seeding will be utilized where reclaimed perimeter <br /> slopes do not allow drilling. Seed mixes listed below will be used to revegetate the site with <br /> Rangeland mix on the slopes and irrigated pasture on the flats. Certified weed free mulch will be <br /> crimped into the surface at 20001bs. per acre. Fertilizer may be added as determined by a soil <br /> test at the time of seeding. Heavy furrows will be left in the tilled topsoil to provide moisture <br /> concentration and shade areas in order to promote better conditions for successful vegetation <br /> establishment. Seeding will take place during the fall following retopsoiling of slopes. Slopes <br /> will be regraded, backfilled, and retopsoiled as soon as they are able to be reclaimed. <br /> Yevoli Cobblestone Pit Grey Ixwxi and As+ciaice YLI <br /> August 2018 E-2 <br />