My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-18_REVISION - M2007003 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007003
>
2018-09-18_REVISION - M2007003 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:06:18 AM
Creation date
10/16/2018 9:15:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007003
IBM Index Class Name
Revision
Doc Date
9/18/2018
Doc Name Note
Request for Conversion of Permit
From
Yevoli Cobblestone Inc.
To
DRMS
Type & Sequence
CN1
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All water rights issues such as availability of water for this operation, consumption rates, dust <br /> control, etc. is presented in Exhibit G - Water Information. <br /> 6. Schedule of Operations <br /> Mining operations will only occur as dictated by demand up to the maximum rates described <br /> earlier in the mine plan. Mining, screening and processing will be conducted with portable <br /> equipment at various times of the year. Product will be sold from this activity throughout the <br /> year, although little is expected to be sold in winter months. The operator will not have night <br /> gravel mining operations, although minor truck activity or repairs may occur after hours. Mining, <br /> processing and trucking will take place no more than 8 hours per day, between the hours of 7 am <br /> and 3 pm, Monday through Friday. <br /> 7. Fremont County Impacts and Environmental Impacts <br /> The impacts to Fremont County will be limited and will be unchanged from the original award of <br /> the pit permit in 2007. No dust is expected from the operation due to low production projections <br /> and the pit and roads being watered as needed. In the event that airborne dust is observable, <br /> immediate action to mitigate dust via roadway wetting and a slowdown of production will be <br /> initiated and sustained until airborne dust has been mitigated. Magnesium chloride and <br /> gravelling of haul roads may also be done, if necessary, to control dust. <br /> Noise from operations will be limited as mining progresses down below grade in each area. <br /> Traffic from the operation is expected to be in the range of 8 to 10 trucks a day. Siloam Road is <br /> already used by truck traffic from the Yevoli Cobblestone Pit. Due to the relatively small scale <br /> and production of this operation, the impacts to Fremont County will be minimal. <br /> Yevoli Cobblestone Pit (.nX LcwcAi anJ ïż½swxielih,PI I <br /> August 2018 D-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.