My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-15_REVISION - M1977223
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977223
>
2018-10-15_REVISION - M1977223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:02:01 AM
Creation date
10/16/2018 9:01:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
REVISION
Doc Date
10/15/2018
Doc Name
Request for Surety Reduction
From
Five Rivers Cattle Feeding
To
DRMS
Type & Sequence
SR1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-AVICOLORADO <br /> Division of Water Resources <br /> - Department of Natural Resowces <br /> ,V,i1,!+ D,.islor, 2 ti+iw Otf!ce <br /> ?!0 E Ab—e,do rA::,, 5,!!ro B <br /> Pueb'.o, CO 81004 <br /> May 9,2016 <br /> Mr. Gary Chapman, P.E. <br /> Enviro-Ag Engineering, Inc. <br /> 3404 Airway Boulevard <br /> Amarillo,Texas 79118 <br /> Mr. Doug Morris, General Manager <br /> JBS Fiver Rivers Cattle Feeding LLC <br /> 2258 Highway 50 <br /> Lamar,CO 81052 <br /> .Re: Colorado Beef(Five Rivers) Reservoir under the Fort Lyon Canal <br /> Liner Test Final Report <br /> Sections 19,T22S, R47W,6th PM <br /> DAM I D:670405 <br /> Water Division 2,Water District 67 <br /> Dear Mr. Chapman and Mr. Morris: <br /> The purpose of this letter is to approve the lining of the above referenced reservoir site based on your March 17, 2016 <br /> submittal of the Performance Test report and documentation. The measured inflow/outflow accounting indicates that this <br /> site has been lined to the design standard referenced in the August, 1999 State Engineer Guidelines for Lining Criteria <br /> for Gravel Pits. <br /> Meeting the design standard requires that all water inflows and outflows for this site must be accounted for as <br /> specified in the decree in Water Court Case No. 2008CW83 and that the recommendations provided in the latest <br /> Dam Safety Inspection report be followed in order to ensure ongoing successful operation of the lined reservoir <br /> to design standards. <br /> Please call me if you have any questions. <br /> Sincerely, <br /> 16CO <br /> Bill W.Tyner, P.E. <br /> Assistant Division Engineer <br /> Enclosure <br /> CC: Rebecca Nichols,Water Commissioner,Water District 67 <br /> Lonnie Spady,Water Commissioner,Water Districts 17167 <br /> Charlie DiDomenico,Augmentation Coordinator Rachel Zancanella, Engineering Support <br /> Melissa Peterson, Denver SEO Team 237 Dan DiRezza,Ground Water Commissioner <br /> Mary Presecan, Leonard Rice Engineers <br /> .-of Lr. L0, <br /> �w" <br /> 310 t An;i ndo.1: ,,.:r, Si.tp B Pue tito, +,--O 81002 F '19.542,3368 F 719 54_1 0800 ww.v <br />
The URL can be used to link to this page
Your browser does not support the video tag.