Laserfiche WebLink
The BOB Conveyor and associated structures are constructed within a previously disturbed area, with drainage <br />from this area controlled by the existing drainage control system. As such, no topsoil recovery occurred and no <br />significant drainage modifications will be required. The conveyor tailpiece was mounted within the existing <br />Secondary Crusher Building, and two support bents and an elevated drive structure were constructed on the west <br />side of the Secondary Crusher Building for the main 48 -inch belt structure. An additional concrete support slab, <br />immediately adjacent to the east wall of the Secondary Crusher Building, may be necessary for the belt take-up. <br />TR17-88 2.05-32.8 06/10/17 <br />