My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-15_PERMIT FILE - M2018054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018054
>
2018-10-15_PERMIT FILE - M2018054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 6:02:26 AM
Creation date
10/15/2018 3:32:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018054
IBM Index Class Name
PERMIT FILE
Doc Date
10/15/2018
Doc Name
Application
From
SEMA Construction
To
DRMS
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "D" <br /> Reclamation Plan <br /> 6.3.4 Reclamation Plan: <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and <br /> materials that will be used to reclaim the affected land to the proposed future land use. This <br /> Plan must be correlated to Exhibit E - Map. The description of the Reclamation Plan must <br /> be adequate to satisfy the requirements of Section 3.1 and demonstrate compliance with Rule <br /> 3. At a minimum, the Application shall include the following information: <br /> (1) The Operation/Applicant has prepared a reclamation plan that addresses the <br /> following items; final grading, which includes drainage, seeding, fertilizing, <br /> vegetation, and topsoil replacement as necessary to achieve the future land use. The <br /> plan is based on traditional reclamation practices. <br /> (a) Specify at what point in the mining plan and to what depth(s) overburden <br /> will be replaced in relation to ongoing extraction: <br /> This is a borrow operation. No overburden shall be removed or replaced. <br /> (b) Specify the maximum gradient of the reclaimed slopes (horizontal: vertical). <br /> If the Application proposes slopes steeper than 3:1, the Operator/Applicant must <br /> include a justification that supports steeper slopes for the proposed post mining <br /> land use, and demonstrates compliance with the applicable performance <br /> standards of Section 3.1: <br /> All reclaimed slopes will be 31-1:1 V or less. The proposed slopes will benefit the post <br /> mining land use, rangeland. <br /> (c) Specify the measures that will be taken to revegetate the site, if applicable, <br /> including: <br /> (i) State the thickness of the plant growth medium to be replaced. Sample and <br /> analyze available soils sufficiently to establish quantity and quality: <br /> Plant growth material will be replaced to a depth range of 4-6 inches. Currently <br /> there will be a shortage of plant growth material. We will need to augment the <br /> available topsoil as discussed in Section 6.3.3(1)(b). <br /> (ii) State at what point in the mining plan the site will be seeded. Explain how <br /> the seedbed will be prepared to eliminate compacted conditions. State the <br /> type, application rate, and soil incorporation methods of fertilizer application, <br /> if any: <br /> Topsoil replacement will be done when ground conditions are appropriate and soon <br /> after regrading is complete. Dependent upon the amount of compaction, the <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.