Laserfiche WebLink
14 Thence S 15' 06' 24" W 223.78 <br /> 15 Thence S 12' 29' 01" W 330.18 <br /> 16 Thence S 13' 25' 23"W 322.53 <br /> 17 Thence S 23' 17' 05" E 92.01 <br /> 18 Thence S 17' 29' 28"W 99.87 <br /> 19 Thence S 10' 16' 23"W 83.22 <br /> 20 Thence S 44' 08' 28" E 825.37 <br /> 21 Thence N 75' 15' 49" E 64.07 <br /> Which is the Point of Beginning (P.O.B.), totaling approximately 26.945' acres. <br /> The average elevation of the Diehl Borrow Pit is 5,562 feet, MSL <br /> (2) The main entrance to the mine site shall be located based on a USGS <br /> Topographic map showing latitude and longitude or Universal Transverse <br /> Mercator (UTM). The operator will need to specify coordinates of latitude and <br /> longitude in degree, minutes and seconds or in decimal degrees to an accuracy <br /> of at least five (5) decimal places (e.g., latitude 37.12345 N, longitude 104.45678 <br /> W). For UTM, the operator will need to specify North American Datum <br /> (NAD) 1927, NAD 1983, or WGS 84, and the applicable zone, measured in <br /> meters. <br /> Entrance: Access is made off the Frontage Road. Take County Rd. 82 (Buckeye <br /> Rd.) exit, turn south on to the Frontage Road and go approximately 1.47 miles to <br /> the point of access. <br /> Geographic Location: Entrance: Lat: 40' 49' 14.00"N, <br /> Long: 104' 5 8' 20.3 0"W <br /> (3) A map showing information sufficient to determine the location of the <br /> affected land on the ground and existing and proposed roads or access roads to <br /> be used in connection with the mining operation. Names of all immediately <br /> adjacent surface owners of record shall also be shown. The operation location <br /> map shall be a standard 1:24,000 scale U.S. Geological Survey map. The <br /> location of the proposed operation shall be shown and labeled with the mine <br /> site name. <br /> 13 <br />