Laserfiche WebLink
J.R. Valentine, Inc. <br /> Geotechnical Testing&Construction Observation <br /> JOB NUMBER:181011 DATE:8/23/2018 <br /> SUBJECT:Holton Stagc 6 <br /> SHEET:1 of 1 <br /> SPECIFICATION COMPACTION&MATERIAL:95+%compaction of dry density+-2%optimum moisture ASTM D 698. <br /> TYPE AND NUMBER OF EARTH MOVING UNITS:Scraper(2),Dozer(1),Excavator(1) <br /> TYPE AND NUMBER OF COMPACTION UNITS:None <br /> NUMBER OF PASSES:NA THICKNESS OF LIFT:NA METHOD OF ADDING MOISTURE:None <br /> PROGRESS REPORT:When 1 arrived at the subject site the contractor was continuing to clean the foundation area and cut a road for the scrapers.No fill was being placed,fill is <br /> now scheduled to start on 8/27/18. <br /> Field Observer: J.R.Valentine <br /> This report presents opinions formed as a result of our observation of fill placement.We have relied on the contractor to continue applying the recommended compactive effort and moisture to the fill during times when our observer is not <br /> observing operations.Tests are made of the fill only as believed necessary to calibrate our observer's judgement.Test data are not the sole basis for opinions on whether the fill meets specifications. <br />