EXHIBIT L- Reclamation Costs <br /> March 2015 the Gallegos Corporation submitted a bond release application for the reclaimed 0.47 acres <br /> in the northeast corner of the Marble Airfield LLC (formerly Gallegos & Associates) to remove them <br /> from the reclamation liability. The private land was removed from the permit area by Acreage Reduction <br /> Request No. 3 (AR-3) in April 2015. The remaining permit area included the 23.33 acres on USFS land. <br /> The portion of the new access road on the Darien property will remain for landowner use per the access <br /> easement. The portion of the new access road on USFS land is approximately 925 feet long containing <br /> 0.34 acres more or less. With the new access road, the net disturbed acres is shown on Table L-1: <br /> Table L-1: Remaining Disturbed Ground <br /> Description Acres <br /> Remaining disturbed ground 0.26 <br /> New access road 0.34 <br /> Total disturbed ground 0.60 <br /> A disturbed area approximately 288 ft. by 100 ft. above the 2008 mining area is on the crest of a ridge <br /> going onto the USFS land and visible from the Key Observation Points (KOP) established for the USFS <br /> EA. A large portion of the existing light-colored rock area is on private land and not affected by the <br /> USFS rock staining stipulations. The reclamation bond will be revised to include rock staining if and <br /> when it is needed. <br /> The existing reclamation bond of$7,725.00 is adequate to reclaim the net 1 acre of disturbed ground that <br /> would remain after contemporaneous reclamation activities excluding any potential rock staining. <br /> Revised: 09/18/2018 <br /> 15 <br />