Laserfiche WebLink
Regards, <br /> Brandon B. Marette <br /> Northeast Region Energy Liaison and Land Use Coordinator <br /> COLORAD ' <br /> 4&10 ond,?AL'AM, <br /> Direct(303)291-7327 <br /> 6060 Broadway,Denver,CO 80216 <br /> brandon marette(a)state co.us <br /> CPW Energy Page I (a)CPW NE I Linkedln <br /> On Wed, Oct 3, 2018 at 11:26 AM Cameron Mang<cmang@semaconstruction.com> wrote: <br /> Brandon, <br /> I wanted to reach out to you in regards to the comments received on our mining permit application. <br /> 1. Active Bald Eagle nest, - We are currently outside of the Bald Eagle nesting season As such, we don't not <br /> feel that a survey is necessary. Should we mobilize equipment after October 15", we will have a qualified <br /> biologist perform a survey to verify the required buffer is maintained between the construction activities and <br /> nesting Bald Eagles. <br /> 2. Potential Bald Eagle winter night roost, -We are currently outside of the Bald Eagle nesting season. As <br /> such, we don't not feel that a survey is necessary. Should we mobilize equipment after October 1S"', we will <br /> have a qualified biologist perform a survey to verify the required buffer is maintained between the <br /> construction activities and nesting Bald Eagles. <br /> 3. Preble's meadow jumping mouse (PMJM) occupied range, and —The proposed site is currently used for <br /> agriculture and rangeland. As such, SEMA does not believe that trapping is warranted. The current vegetation <br /> does not meet the anticipated PMJM habitat. Should CPW still have concerns, SEMA would like to request a <br /> meeting onsite to inspect the site and determine if contacting USFWS is truly warranted. <br /> 5 <br />