Laserfiche WebLink
NewFields <br /> ' Perspective. Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek & Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: May 9, 2018 <br /> S M T W T F S <br /> ' Temperature: Low: 43'F to High: 66°F Weather: Partly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 11 <br /> ' 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT 321C excavator was utilized to expose geomembrane by removing the Drain Cover Fill <br /> ' (DCF) between 9819' and 9832' elevations. <br /> A CAT D6T LGP dozer was used to remove (DCF) below 9780' elevation, stockpiling near the 9750' <br /> bench. The dozer worked on a minimum of 2' of geomembrane cover. <br /> 1 A CAT D9T and A CAT D6T LGP dozers were used to remove ore material between the 9750' bench <br /> and 9700' elevation, stockpiling near the 9750' elevation. Both dozers worked on a minimum of <br /> 4' of geomembrane cover. <br /> 1.2 Geomembrane Repair <br /> ' No activities preformed during this shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> ' NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br /> ' 8012400 <br />