Laserfiche WebLink
■NewFields <br />Perspective. Vision. Solutions. <br />FIELD DAILY PROGRESS REPORT <br />Client: Cripple Creek & Victor Gold Mining Company <br />Project: VLF2 Geomembrane Recertification <br />NewFields Project Number: 475.0106.026 <br />Date: May 24, 2018 <br />S M T W T F S <br />Temperature: Low: 42°F to High: 64°F Weather: Partly Cloudy <br />NEWFIELDS PERSONNEL <br />Name Hours <br />Benjamin Melly 11 <br />1.0 AMES CONSTRUCTION ACTIVITIES <br />1.1 Ore Excavation <br />A CAT 321C L excavator was utilized to expose geomembrane by removing the Drain Cover Fill <br />(DCF) between 9650' and 9750' elevations on the South side. <br />A CAT D6T LGP dozer was used to remove ore material between 9643' to 9687, elevations <br />pushing downhill to the stockpile near 9643' elevation. The dozers worked on a minimum of two <br />feet of geomembrane cover. <br />1.2 Geomembrane Repair <br />No activities preformed during this shift. <br />2.0 NEWFIELDS ACTIVITIES <br />NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br />