Laserfiche WebLink
■NewFields <br />Perspective. Vision. Solutions. <br />FIELD DAILY PROGRESS REPORT <br />Client: Cripple Creek & Victor Gold Mining Company <br />Project: VLF2 Geomembrane Recertification <br />NewFields Project Number: 475.0106.026 <br />Date: May 23, 2018 <br />S M T W T F S <br />Temperature: Low: 39°F to High: 60°F Weather: Partly Cloudy <br />NEWFIELDS PERSONNEL <br />Name Hours <br />Benjamin Melly 11 <br />1.0 AMES CONSTRUCTION ACTIVITIES <br />1.1 Ore Excavation <br />A CAT D9T, and a CAT D6T LGP dozer were utilized to remove ore material between 9650' to <br />9687' elevations pushing downhill to the stockpile near 9650' bench. The dozers worked on a <br />minimum of 4' of geomembrane cover. The removed ore stockpile was loaded and hauled by the <br />Mine Operations. <br />A CAT 321C L excavator was used to expose geomembrane by removing the Drain Cover Fill (DCF) <br />between 9650' and 9695' elevations and between 9750' and 9850' benches. The south extent of <br />geomembrane damage was located during the shift. <br />1.2 Geomembrane Repair <br />No activities preformed during this shift. <br />2.0 NEWFIELDS ACTIVITIES <br />NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br />