Laserfiche WebLink
■NewFields <br />E Perspective. Vision. Solutions. <br />FIELD DAILY PROGRESS REPORT <br />Client: Cripple Creek & Victor Gold Mining Company <br />Project: VLF2 Geomembrane Recertification <br />NewFields Project Number: 475.0106.026 <br />Date: May 21, 2018 <br />S M T W T F S <br />Temperature: Low: 38°F to High: 61°F Weather: Cloudy <br />NEWFIELDS PERSONNEL <br />Name Hours <br />Benjamin Melly 11 <br />1.0 AMES CONSTRUCTION ACTIVITIES <br />1.1 Ore Excavation <br />A CAT D9T dozer and a CAT D6T LGP dozer were utilized to remove ore material between the <br />96S0' and 9687' elevations stockpiling near 9650' bench. The D6T and D9T worked on four -feet <br />of geomembrane cover. <br />A CAT 321C L excavator was used to remove Drain Cover Fill (DCF) from the existing Soil Liner Fill <br />(SLF) surface between 9650' and 9695' elevations. <br />A CAT 321C L excavator was used to expose geomembrane on the North side by removing the <br />DCF between 9687' and 9750' elevations. <br />1.2 Geomembrane Installation <br />No activities performed during the shift. <br />