Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />■NewFields <br />Perspective. Vision. Solutions. <br />FIELD DAILY PROGRESS REPORT <br />Client: Cripple Creek & Victor Gold Mining Company <br />Project: VLF2 Geomembrane Recertification <br />NewFields Project Number: 475.0106.026 <br />Date: May 18, 2018 <br />S M T W T F S <br />Temperature: Low: 41°F to High: 63°F Weather: Partly Cloudy <br />NEWFIELDS PERSONNEL <br />Name Hours <br />Benjamin Melly 11 <br />1.0 AMES CONSTRUCTION ACTIVITIES <br />1.1 Ore Excavation <br />A CAT 321C L excavator was utilized to remove Drain Cover Fill (DCF) from the existing Soil Liner <br />Fill (SLF) surface and existing geomembrane between 9650' and 9735' elevations. <br />One CAT D9T dozer and one CAT D6T LGP dozer were used to remove ore material between the <br />9650' and 9750' benches, stockpiling on the north side near the 9650' elevation. Both dozers <br />worked on a minimum of four feet of geomembrane cover. <br />1.2 Geomembrane Repair <br />No activities preformed during this shift. <br />2.0 NEWFIELDS ACTIVITIES <br />NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br />