Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />■NewFields <br />Perspective. Vision. Solutions. <br />FIELD DAILY PROGRESS REPORT <br />Client: Cripple Creek & Victor Gold Mining Company <br />Project: VLF2 Geomembrane Recertification <br />NewFields Project Number: 475.0106.026 <br />Date: May 17, 2018 <br />S M T W T F S <br />Temperature: Low: 42°F to High: 66°F Weather: Partly Cloudy <br />NEWFIELDS PERSONNEL <br />Name Hours <br />Benjamin Melly 11 <br />1.0 AMES CONSTRUCTION ACTIVITIES <br />1.1 Ore Excavation <br />One CAT D7H dozer and one CAT D6T LGP dozer continued to remove ore material between 9650' <br />to 9700' elevations pushing down to the stockpile near 9650' bench. The dozers worked on a <br />minimum of four feet of geomembrane cover. <br />A CAT 321C L excavator was utilized to expose geomembrane by removing the Drain Cover Fill <br />(DCF) between 9650' and 9750' benches. <br />1.2 Geomembrane Repair <br />No activities preformed during this shift. <br />2.0 NEWFIELDS ACTIVITIES <br />NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br />