Laserfiche WebLink
■NewFields <br /> Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number:475.0106.026 <br /> Date: May 8, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low:46°F to High: 67°F Weather: Clear,Windy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Ore Excavation <br /> A CAT D9T and A CAT D6T LGP dozer continued to remove ore material between the 9750' and <br /> ' 9850' benches, stockpiling on the north side near the 9750' elevation. Both dozers worked on a <br /> minimum of 4' of geomembrane cover. <br /> A CAT 321C excavator continued to expose geomembrane by removing the Drain Cover Fill (DCF) <br /> between 9832' elevation and 9850' bench. Also, A CAT D6T LGP dozer was used to remove Drain <br /> Cover Fill(DCF) below 9810' elevation, stockpiling near the 9750' bench. <br /> 1.2 Geomembrane Repair <br /> ' No activities preformed during this shift. <br /> ' 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br />