Laserfiche WebLink
"■ NewFields <br /> ' Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project:VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: May 16, 2018 <br /> ' S M T W T F S <br /> Temperature: Low: 42°F to High: 62°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Ore Excavation <br /> A CAT 111C L excavator was used to expose geomembrane by removing the Drain Cover Fill (DCF) <br /> between 9750' and 9850' benches. <br /> A CAT D9T, a CAT D7H and a CAT D6T LGP dozer were utilized to remove ore material between <br /> ' 9650' to 9750' elevations pushing down to the stockpile near 9650' bench. The dozers worked <br /> on a minimum of 4' of geomembrane cover. The removed ore stockpile was loaded and hauled <br /> by the Mine Operations. <br /> 1.2 Geomembrane Repair <br /> No activities preformed during this shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br />