Laserfiche WebLink
1 <br /> ■NewFields <br /> ' Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number: 475.0106.026 <br /> Date: May 15, 2018 <br /> S M T W T F S <br /> ' Temperature: Low: 38°F to High: 55°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D9T and a CAT D6T LGP dozer were used to remove ore material between 9650' to 9700' <br /> elevations pushing down to the stockpile near 9650' bench. Both dozers worked on a minimum <br /> of 4' of geomembrane cover.The stockpile was loaded and hauled by the Mine Operations. <br /> ' A CAT 321C L excavator was utilized to expose geomembrane by removing the Drain Cover Fill <br /> (DCF) between 9725' and 9750' elevations. A CAT D6T LGP dozer was also used to remove DCF <br /> below 9760' elevation working on two feet above the geomembrane. The material was pushed <br /> down hill near the 9650' bench. <br /> 1.2 Geomembrane Repair <br /> No activities preformed during this shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br />