Laserfiche WebLink
NewFields <br /> ' Perspective. Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> 1 Client: Cripple Creek &Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number: 475.0106.026 <br /> Date: May 14, 2018 <br /> rS M T W T F S <br /> ' Temperature: Low: 38°F to High: 56°F Weather: Mostly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT 321C L excavator continued to expose geomembrane by removing the Drain Cover Fill <br /> (DCF) between 9760' and 9775' elevations. A CAT D6T LGP dozer was utilized to remove DCF <br /> below 9775' elevation and worked two feet above the geomembrane near the 9750' bench. <br /> ' A CAT D9T and A CAT D6T LGP dozer also continued to remove ore material between the 9650' <br /> and 9750' benches, stockpiling near the 9650' elevation. Both dozers worked on a minimum of <br /> 4' of geomembrane cover. <br /> I 1.2 Geomembrane Repair <br /> No activities preformed during this shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br /> ' www.NewFields.com 9400 Station St,Lone Tree,Colorado 80124 <br />