Laserfiche WebLink
■NewFields <br /> ' Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number:475.0106.026 <br /> Date: May 11, 2018 <br /> S M T W T F S <br /> ' Temperature: Low: 42°F to High: 66°F Weather: Partly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> 1 A CAT D9T and A CAT D6T LGP dozer were used to remove ore material between the 9650' and <br /> 9750' benches, stockpiling on the north side near the 9650' elevation. Both dozers worked on a <br /> minimum of 4' of geomembrane cover. <br /> rA CAT 321C L excavator was utilized to expose geomembrane by removing the Drain Cover Fill <br /> (DCF) between 9775' and 9790' elevations. A CAT D6T LGP dozer was also used to remove DCF <br /> ' more than two feet above the geomembrane near the 9750' elevation. <br /> 1.2 Geomembrane Repair <br /> No activities preformed during this shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, DCF removal, and geomembrane exposure. <br /> r <br /> www.NewFields.com 9400 Station St,Lane Tree,Colorado 80124 <br /> . , .. <br /> t <br />