Laserfiche WebLink
■NewFields <br /> ' Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number:475.0106.026 <br /> Date: April 9, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 25°F to High: 41'F Weather: Overcast <br /> NEWFIELDS PERSONNEL <br /> ' Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Ore Excavation <br /> A CAT D9T dozer and a D6T LGP dozer removed ore material between 9750' and 9850' elevations <br /> stockpiling the material near the 9750' bench to placed later. The ore material was cut to 2.5' <br /> ' above the liner using D6T. The D9T on a minimum 4' of geomembrane cover. <br /> 1.2 Geomembrane Installation: <br /> No activities performed during the shift. <br /> ' 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> ' NewFields personnel attended the project pre-shift safety meeting conducted by Ames <br /> Construction. <br />