Laserfiche WebLink
®■NewFields <br /> Perspective.Vision.Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number:47S.0106.026 <br /> Date:April 6, 2018 <br /> S M T W T ° S <br /> ' Temperature: Low: 330F to High: 390F Weather: Overcast with Snow <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> t1.1 Ore Excavation <br /> Ames removed ore material from the area between the 9750' and 9850' benches stockpiling on <br /> ' the DCF just below the 9750 bench. The ore was pushed downhill using a CAT D6T LGP dozer. <br /> A four-inch CPe pipe was exposed using a mini excavator and laborers. The pipe was cut to <br /> ' allowing to allow a measuring tape to be placed in the pipe. The measuring tape was pushed <br /> down the slope in the pipe and stopped at 61 feet due to a possible blockage. This indicates the <br /> ' possibility of DCF movement at that location. <br /> 1.2 Geomembrane Installation: <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal and pipe measurement. <br /> 9400 Station .80124 T.720.508.3300 <br />