Laserfiche WebLink
y■NewFields <br /> Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number: 475.0106.026 <br /> Date: April 25, 2018 <br /> S M T W T F S <br /> ' Temperature: Low: 28`F to High: 48°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> ' 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D9T dozer and a CAT D6T LGP dozer continued to remove ore material between 9850' to <br /> 9750' elevations pushing down to the stockpile on the North side. The stockpile was loaded and <br /> hauled by the Mine Operations. <br /> 1.2 Geomembrane Repair <br /> ' No activities performed. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> ' NewFields personnel observed ore removal. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> 00 Station St,Lone Tree,Colorado 8012400 <br />