Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions, <br /> ' FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number:475.0106.026 <br /> Date: April 20, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 220F to High: 340F Weather: Clear <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 5 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D6T LGP dozer was used to buttress the area near the 9650' bench. The buttress <br /> construction will continue Monday as more material is needed. <br /> A CAT D9T dozer and a CAT D6T LGP dozer were used to remove ore material pushing downhill <br /> to the stockpile on the North side. <br /> ' 1.2 Geomembrane Repair <br /> 2.0 NEWFIELDS ACTIVITIES <br /> ' NewFields personnel observed ore removal and buttress construction near the 9650' bench. <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> Kevin Dumbrowski (Ames) was going to draft a proposal for Monday as a plan going forward. <br /> 00 Station St,Lone Tree,Colorado 80124 T.720.508.3300 <br />