Laserfiche WebLink
r <br /> ■NewFields <br /> ' r Perspective.Vision.Solutions. <br /> rFIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: April 18, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 22°F to High: 41°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1 Ore Excavation <br /> A CAT D6T LGP dozer was used to remove ore material between the 9650' and 9660' benches, <br /> ' stockpiling it near the 9650' bench. The D6T worked on a minimum of 2'of geomembrane cover. <br /> The mini excavator was used to excavate test pits locating the geomembrane along the 9660' <br /> ' elevation. Four test pits were excavated at an approximate interval of ten feet. Damaged <br /> geomembrane was exposed on the south side of the recertification area. <br /> r1.2 Geomembrane Repair <br /> ' No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> rNewFields personnel observed ore removal, geomembrane exposure, and the excavation of test <br /> pits during the shift. <br /> www.NewFields.com 9400 Station St,Lone Tree,Colorado 80124 T.720.508.3300 <br /> r <br /> r <br />