Laserfiche WebLink
■NewFields <br /> rPerspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek&Victor Gold Mining Company <br /> Project:VLF2 Geomembrane Recertification <br /> NewFields Project Number:475.0106.026 <br /> Date: April 17, 2018 <br /> ' S M T W T F S <br /> Temperature: Low: 36'F to High: 48°F Weather: Overcast, Windy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D9T dozer and a CAT D6T LGP dozer were utilized to remove ore material between the <br /> ' 9650' and 9710' benches stockpiling near 9650' bench. The D6T and D9T worked on a minimum <br /> of 2' and 4' of geomembrane cover, respectively. <br /> rThe mini excavator was used to excavate test pits to locate the geomembrane along the 9710' <br /> elevation. Five test pits were excavated at an approximate interval of ten feet. The damaged <br /> geomembrane was exposed to the toe of stockpile on the north side. Exposure of damaged <br /> geomembrane will continue on the south side tomorrow. <br /> ' 1.2 Geomembrane Repair <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, geomembrane exposure, and the excavation of test <br /> pits during the shift. <br /> www.NewFields.com 9400 Station St,Lone Tree,Colorado 80124 T.720.508.3300 <br />