Laserfiche WebLink
■NewFields <br /> Perspective.Vision.Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek &Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number:475.0106.026 <br /> Date: April 13, 2018 <br /> r <br /> S M T W T . S <br /> Temperature: Low: 29°F to High:41°F Weather: Overcast <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D9T dozer and a CAT D6T LGP dozer were utilized to remove ore material between the <br /> ' 9650' and 9750' benches stockpiling near 9650' bench. The D6T and D9T worked on four-feet of <br /> geomembrane cover. <br /> The mini excavator was used to excavate test pits to locate the geomembrane along the 9740' <br /> elevation. Nine test pits were excavated at an approximate interval of 20'. All existing DCF, <br /> ' geomembrane, and pipe exposed were found to be undisturbed and in as-built condition. <br /> 1.2 Geomembrane Installation <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, geomembrane exposure, and the excavation of test <br /> pits during the shift. <br /> www.NewFields.com 9400 Station St,Lone Tree,Colorado 80124 T.720.508.3300 <br />