My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-09_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-10-09_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 5:30:20 AM
Creation date
10/9/2018 2:02:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/9/2018
Doc Name Note
Review of Record Construction Report Part 1 of 2
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■NewFields <br /> ' Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number:475.0106.026 <br /> Date:April 11, 2018 <br /> S M T W T F S <br /> ' Temperature: Low: 37°F to High: 58°F Weather: Partly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 10 <br /> ' 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D9T dozer and a CAT D6T LGP dozer were used to remove ore material between the 9650' <br /> and 9750' benches stockpiling near 9650' bench. The D6T worked on a minimum of 2' of <br /> geomembrane cover and the D9T worked on a minimum of 4' of geomembrane cover. <br /> Approximately 25% of the material was pushed downhill using both dozers on the northside. <br /> The mini excavator was utilized to excavate test pits to locate the geomembrane along the 9758' <br /> ' elevation. Six test pits were excavated at an interval of twenty feet. All liner and DCF materials <br /> were found to be in placed as installed. <br /> 1.2 Geomembrane Installation: <br /> No activities performed during the shift. <br /> ' 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, geomembrane exposure, and the excavation of test <br /> ' pits during the shift. <br />
The URL can be used to link to this page
Your browser does not support the video tag.