My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-09_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-10-09_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2025 5:30:20 AM
Creation date
10/9/2018 2:02:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/9/2018
Doc Name Note
Review of Record Construction Report Part 1 of 2
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U NewFields <br /> ' Perspective.Vision.Solutions. <br /> October 5, 2018 <br /> NewFields Job 475.0106.026 <br /> ' Cripple Creek &Victor Gold Mining RECEIVED <br /> P.O. Pox 191 OCT 0 9 2Q 18 <br /> 100 North 3rd Street <br /> Victor, Colorado 80860 DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> ' Attention: Mr. Laurin Colby <br /> Senior Metallurgist <br /> RE: Cripple Creek&Victor, Co., Cresson Project M-1980-244; <br /> Review of Record of Construction Report, VLF2 Recertification Report, Subgrade and <br /> Geomembrane 9750-9900' Elevations <br /> Dear Mr. Colby, <br /> NewFields Mining Design & Technical Services (NewFields) has prepared this letter in response <br /> to comments pertaining to the "Record of Construction Report, VLF2 Recertification Project, <br /> Subgrade and Geomembrane 9750—9900' Elevations" by the Colorado Division of Reclamation <br /> Mining and Safety(DRMS), received on October 3,2018. DRMS comments appear in blue and are <br /> followed by NewFields' response. <br /> ' 1. Section 2 Project Description: This report is meant to be a stand-alone document that <br /> describes recertification activities of the Subgrade and geomembrane between 9750'and <br /> 9900' elevations. The text states "This report covers the recertification construction <br /> activities monitored between April 2018 through July 2018."Please revise this statement <br /> ' to accurately describe what is contained in this report or provide the missing Daily <br /> Observation Reports and expand the text to include what was done from April 2018 <br /> through May 2018. <br /> In order to replace the geomembrane liner between the 9650'-9750' benches,the contractor had <br /> to remove all the Drain Cover Fill (DCF) starting at 9900' bench. The dailies observation reports <br /> for the removal of the ore and DCF had previously been submitted in the "Record of Construction <br /> Report, VLF2 Recertification Project, Subgrade and Geomembrane 9650 — 9750' Elevation". In <br /> Attachment A of this addendum,the daily observation reports for period between April 6— May <br /> 25, 2018 and June 19—June 23, 2018 have been included. No work was performed with the 9750 <br /> -9900' benches between May 26—June 18, 2018. <br />
The URL can be used to link to this page
Your browser does not support the video tag.