Laserfiche WebLink
October 1, 2018 <br />Photograph 7: West Side Fill 3H: IV Face Looking East (9/27/2018) <br />2.5 Revegetation <br />Seeding activities did not occur this quarter. There is one topsoil pile located on the fill. Currently, <br />topsoil is being removed from this pile, but the topsoil is not being placed on the fill. The only <br />area on the fill that requires any topsoil and seeding is located under the topsoil pile. <br />3.0 References <br />Agapito Associates, Inc. (2009), "Horse Gulch Fill Stability Analysis" submitted to Trapper <br />Mining, Inc., May 29. <br />Colorado Division of Minerals and Geology (1980), "Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining," revised 9/14/05, Section 4.09.1. <br />9 <br />