Laserfiche WebLink
October 1, 2018 <br />Horse Gulch Fill Quarterly Inspection Report <br />Third Quarter 2018 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 <br />Removal of All Organic Material and Topsoil <br />2.2 <br />Placement of Underdrainage Systems <br />2.3 <br />Installation of Surface Drainage Systems <br />2.4 <br />Placement and Compaction of Fill Materials <br />2.5 <br />Revegetation <br />3.0 References <br />certify that this report was prepared by me. <br />Tonia Marie Perkins <br />CO PE 43864 <br />Mining Engineer <br />Trapper Mining, Inc. <br />4�`PD`0 <br />II IC/CF <br />ci��, <br />'P <br />° 43864 Cn: cri <br />90. 0: <br />it nll\0 <br />1 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />6 <br />6 <br />