TECHNICAL REVISION NO. 5—Plant Modification <br /> HUKILL GULCH MILLSITE (DRMS Permit No. M-2009-076) <br /> Venture Resources, Inc. <br /> are terminated. While it is Venture's expressed intent to retain the structure"in place"at the conclusion of <br /> milling operations, Venture acknowledges that DRMS will require the provision of an incremental <br /> reclamation bond amount sufficient to cover costs associated with the equipment removal and restoration <br /> of the affected area. To that end,Venture has prepared the included incremental reclamation cost estimate <br /> to address mill structure demolition and site restoration(reclamation). <br /> It is anticipated that the planned plant modification will not only enhance gold recovery, but also result in <br /> the reduction (or elimination) of the potential for adverse environmental impact within the process plant <br /> operations area, and the downgradient tailing storage facility, due to the planned elimination of the froth <br /> flotation recovery circuit(and its associated process chemicals).Venture has,however,retained provision <br /> for lime addition(for purposes of pH control)in the revised process flow schematic. <br /> Venture will retain the current "approved" status (authorizing the utilization of froth flotation), in the <br /> event that it is later determined that froth flotation is necessary to achieve more economic or technically <br /> efficient gold recovery. To this end, sufficient space is being allocated within the footprint of the new <br /> structure to accommodate(potential)future reinstallation of the froth flotation equipment. <br /> Process areas within the new structure will be equipped with full perimeter spill containment, to include <br /> sloped floors and collection sumps. Venture acknowledges that the process plant area will continue to be <br /> considered an Environmental Protection Facility (EPF) and remain subject to the current Designated <br /> Mining Operation (DMO) status. Venture will accordingly update the Hukill Mill site's existing <br /> Stormwater Management Plan to reflect the incorporation of the proposed new structure. <br /> The existing facilities (i.e.,the current or pre-modification conditions) are depicted in Figure 1: Existing <br /> Process Plant Area Site Plan. <br /> The proposed process plant modification will affect a limited portion of the permit sub-area currently <br /> dedicated to the process plant facilities,as depicted in Figure 2:Proposed Mill Upgrade Site Plan. <br /> Milling: The trailer unit that currently houses the ball mill unit and gravity concentrating table will be <br /> removed from the site. A ball mill will be placed into the new, permanent structure(in conjunction with a <br /> new gravity recovery circuit). <br /> Gold Recovery: The trailer unit that currently houses the froth flotation equipment will be removed from <br /> the site. <br /> New Mill Structure: Venture proposes to construct a nominal 40 ft. x 50 ft. pre-engineered structure on a <br /> two-level concrete slab at the approximate same location as that currently occupied by the two (to-be- <br /> removed)trailer units that currently contain the ball mill and flotation/gravity circuits, respectively. The <br /> structure will be located immediately to the southeast of the established parking and incoming ore staging <br /> area. The nominal 50 ft. (longitudinal) dimension is to be oriented northwest to southeast. Crushed ore <br /> will enter(via covered conveyor)through the southeast end of the structure. <br /> 2 <br />