My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-10-05_REVISION - M2009076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009076
>
2018-10-05_REVISION - M2009076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 2:54:11 AM
Creation date
10/5/2018 4:01:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
REVISION
Doc Date
10/5/2018
Doc Name
Request for Technical Revision
From
Hukill Gulch Millsite
To
DRMS
Type & Sequence
TR5
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 187* * 1313 Sherman Street Room 215,Denver Colorado 80203 h 303 866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 2Q09-076 Site Name:Huklll Gulch Millsite <br /> County Clear Creek TR# (DRMS Use only) <br /> Permittee:Venture Resources, Inc <br /> �� <br /> Operator(If Other than Permittee)..(same) <br /> Permittee Representative:Patrick Maher <br /> TR05 Oul U52018 <br /> Please provide a brief description of the proposed revision: <br /> MINING AND SAFETY Cn <br /> The operator wishes to improve the milling process and increase the milling rate by replacing the portable equipment and C <br /> temporary structures with larger equipment, more flotation cells, and larger-capacity water tanks,to be housed in a concrete o.� <br /> and steel mill bu"ding. This reviSiOl I 0111y affects the appe, (11i"Miml Y)pvrtmul,of the site, and does,iot invo le tailil lys <br /> disposal(lower)area. <br /> � aO <br /> Cl) t0 <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application o g <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or Cn <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to o <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will 3 o O <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a� �_ Cal <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 El <br /> 1 IOd, 112d(1, 2 or 3) $1006 F <br />
The URL can be used to link to this page
Your browser does not support the video tag.