Laserfiche WebLink
Potential Studies&Application Estimated Agency <br /> Permit/Clearance Regulatory ncy F When Required Requirements Review Time <br /> LOCAL—Weld County <br /> County Floodplain Applicable county level For development within a designated floodplain. Site Development plans depict 60 to 90 days <br /> Development Permit planning and development flood hazard data. <br /> office(s) If you plan to build in the flood <br /> plain your foundation plans are <br /> required to be designed and <br /> stamped by a Colorado State <br /> licensed architect or engineer and <br /> an elevation certificate may be <br /> required. <br /> County Road Cut and/or Applicable county level A Right-of-Way Permit will be required Application. 5 to 10 days <br /> Right-of-Way Permit planning and development whenever work will occur within any County Fees:TBD. <br /> offices) Right-of-Way, but not in the traveled portion of <br /> a roadway. <br /> A Road Cut Permit will be required whenever a <br /> cut will be made within the traveled portion of <br /> any County roadway, whether the surface is <br /> improved or unimproved. <br /> Colorado House Bill 1041 Applicable county level Depending on the county specific process, a Permit application. 90 to 180 days <br /> Application to Conduct a planning and development Conditional Use/Use by Special Review and/or a Fee:The County will determine a <br /> Designated Activity of office(s) 1041 permit may apply. A pre-application fee sufficient to cover the costs of <br /> State and Local Interest meeting would be required to determine the application processing. <br /> --OR-- level of permitting required. <br /> Conditional Use/Use by <br /> Special Review Permit <br /> Local Soil Conservation Applicable soil conservation Consultation regarding range conservation NA NA <br /> District district(s) practices. <br />