Laserfiche WebLink
Exhibit M: - Other Permits and Licenses <br /> 6.4.13 Operator is currently evaluating other permits and licenses which may be applicable and/or required to conduct the proposed <br /> operations. Please see matrix below. <br /> Potential Studies&Application Estimated Agency <br /> Permit/Clearance Regulatory en When Required Requirements Review Time <br /> FEDERAL <br /> National Environmental U.S. Forest Service (BLM?) Pending consultation Pending review,an Environmental 6 to 24 months <br /> Policy Act Analysis or an Environmental <br /> Report for a Categorical Exclusion <br /> may be required <br /> Section 404 U.S.Army U.S.Army Corps of Before commencing activities required for the Wetland delineation. 60 to 90 days <br /> Corps of Engineers Engineers-applicable construction, maintenance, repair, and removal Cultural resource inventory <br /> Nationwide Permit district(s) of any utilities or facilities in waters of the U.S., Pre-construction notification (PCN) <br /> provided the activity does not result in the loss Mitigation. <br /> of greater than one-half acre of waters of the Fee: None ($100 for Individual <br /> U.S. Permit, if required). <br /> Endangered Species Act- U.S. Fish and Wildlife When an activity may affect federally listed Habitat assessment. Typically 30 to 45 <br /> Federally Threatened Service Colorado Ecological threatened and endangered species and critical Biological assessment of potential days for each <br /> and Endangered Species Services Field Office habitats. impacts. consultation <br /> Consultation P.O. Box 25486 Species-specific surveys. submittal <br /> Denver, CO 80225 <br /> Migratory Bird Treaty USFWS Colorado Ecological When construction or operation of a proposed Habitat assessment. Typically 30 to 45 <br /> Act, Bald and Golden Services Field Office facility could impact migratory birds, and bald Avian nest surveys (if agencies days for each <br /> Eagle Protection Act P.O. Box 25486 and golden eagles. request). consultation <br /> Compliance Denver, CO 80225 submittal <br /> STATE <br /> Air Pollution Emission Colorado Department of Projects greater or equal to 25 contiguous acres APEN. 90 days <br /> Notice (APEN) Public Health and and/or six months in duration typically require Fugitive Dust Control Plan. <br /> Environment submission of an APEN and, in some cases,an air Fee: Based on emissions. <br /> APCD-SS-B1 permit. Even if a permit is not required, a <br /> 4300 Cherry Creek Drive Fugitive Dust Control Plan must be developed <br /> South and followed during construction. <br /> Denver, CO 80246-1530 <br />