Laserfiche WebLink
-4- <br /> 12. Primary future Post-minim land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> 1:..1 Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) F Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one): <br /> El Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> P� Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) LJ Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Mining in the quarry will be conducted via conventional methods Including excavators,dozers,loaders,trucks and conveyors and will be generally similar to sand and gravel mining <br /> 15. On Site Processing: F'V] Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Sand will be removed from working face via excavators/dozers and transported to the sand plant where it will be crushed,screened,washed and dried Plant byproduct sand(sand outside of the salable <br /> range)will be returned to the quarry and used in reclamation of the site <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> No acid producing chemicals are anticipated to be used in the operation,and the mining of sand will not use any chemicals Flocculants commonly used in water treatment plants will be used in the sand plant to facilitate reuse of water <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> N/A <br />