My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-09-04_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-09-04_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 7:08:41 AM
Creation date
10/5/2018 10:39:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
9/4/2018
Doc Name
Volume 1 Rule 4
Section_Exhibit Name
4.01 Throuugh 4.30
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />stemming weight, 4) avoids overdigging the front row of holes and 5) avoids overloading the <br />front row of holes. <br />Colowyo does perform event triggered monitoring. However, Colowyo will not commit to daily <br />monitoring due to unforeseen circumstances where the seismograph monitoring unit may be <br />getting repaired or calibrated. Colowyo employs an Instantel Inc. Minimate Plus <br />seismograph/microphone with a low frequency limit of 2 Hz which corresponds to an airblast <br />standard of 133 dB (peak). Records of airblast monitoring will contain the information required <br />by Rule 4.08.5(17). This information will include either a recording of the calibration signal of <br />the monitoring instrument's gain setting at the time of each blast, or certifications of the <br />instrument's annual calibration. <br />Colowyo will conduct blasting to prevent injury to persons and damage to public or private <br />property outside the permit area. Colowyo will insure that the maximum peak particle velocity will <br />not exceed the criteria as prescribed by utilizing the equation found in Rule 4.08.4(l 0) (b) (i) when <br />conducting blasting operations that could affect any dwelling, public building, school, church, or <br />commercial or institutional building. As shown in the Blasting Analysis Map (Map 26) Colowyo <br />has determined the maximum pounds of explosives per 8ms period of time for variable distance <br />from any such structures. <br />The number of blast holes detonated per 8ms period will be calculated according to the equation <br />in Rule 4.08.4(10)(c)(i) in order to determine the maximum weight of explosive that can be <br />detonated within any eight ms period. <br />4.08.5 Records of Surface Blasting Activities <br />Colowyo will record all blasts including coal, overburden, and overburden pre -split blasts in a <br />format as shown in Section 2.05, Figure 2.05-2, Blasting Report, which conforms to the <br />requirements of 4.08.5. Conducting blasting operations in accordance with the equation in <br />4.08.4(10)(c)(i) deems peak particle velocities from blasting to be within the regulatory limits <br />described in 4.08.4(10). Periodic airblast monitoring occurs at Colowyo. The monitor is located <br />along Moffat County Highway 13 at the Durham/Ott Ranch. Records of airblast monitoring <br />described on page 2.05-30 will contain the information required by Rule 4.08.5(17). This <br />information will include either a recording of the calibration signal of the monitoring instrument's <br />gain setting at the time of each blast, or certifications of the instrument's annual calibration. <br />4.08.6 Seismographic Measurements <br />Colowyo will use the explosives equation found in Subsection 4.08.4 (10)(b)(i) to limit the number <br />of blast holes per 8ms period of time such that the peak particle velocity limit of one inch per <br />second will not be exceeded. <br />On June 19 and 20, 1979 initial seismic monitoring of shots at the Colowyo operation was <br />conducted. The results of this seismographic work are set forth in Exhibit 14, Seismographic <br />Measurements. <br />Rule 4 Performance Standards 4-34 Revision Date: 5/25/18 <br />Revision No.: RN -07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.