Laserfiche WebLink
Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />AB.AVG. <br />Material consistency: <br />1.200 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.422 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />MaterialWeight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3054 <br />Adjustedunit 876.59 LCY/hr <br />production: <br />Adjustedfleet 3506.36 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s ) <br />Unitcost: $0.540/LCY <br />Total job time: 523.23 Hours <br />Totaljob cost: $991,339 <br />Page 32 of 115 <br />CIRCES Cost Estimatmg Solware <br />