Laserfiche WebLink
Table 13C-27 Topsoil Stockpile Revegetation <br />Topsoil Stockpile <br />Acres to be Reseeded <br />Number <br />26B 2.2 <br />26A 24.2 <br />Table 13C-28 Collom In -Pit Drill Holes <br />Plugging <br />Drill Hole Number <br />Requirements <br />C-18-01 through C-18-27 Please see Exhibit 27, <br />Item 3 <br />Table 13C-29 Collom Pit Power Distribution <br />Task <br />Remove Power Lines <br />Topsoil Replacement <br />Reseed Disturbance <br />16,897 Feet <br />25,000 Cubic Yards <br />7.6 Acres <br />EXHIBIT 13C <br />Volume 20 Page 18 Revision Date: 6/19/18 <br />Revision No.: TR -121 <br />