Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.60 Minutes <br />0.70 Minutes <br />Page 45 of 135 <br />Site Altitude: 5700 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />T7anl RN1iP' <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />CAT HB <br />Page 45 of 135 <br />Site Altitude: 5700 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, maintained 3.0 <br />T7anl RN1iP' <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res Velocity Travel Time <br />% 00m) (min) <br />1 <br />800.00 <br />0.83 <br />3.00 <br />3.83 1667 0.61 <br />Haul Time: 0.61 minutes <br />R vfnrn R nlltA- <br />Seg # <br />Haul Distance (Ft) <br />Grade Roll. Res Total Res <br />% <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />-0.83 3.00 2.17 <br />2914 <br />0.47 <br />Return Time: <br />0.47 <br />minutes <br />Total Scraper team cycle time: <br />2.38 <br />minutes <br />Adjusted for job conditions: <br />606.81 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,213.61 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />2,427.23 <br />LCY/Hour <br />Unadjusted unit production/hour: 731.09 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) Total job time: <br />301.24 Hours <br />Unit cost: $0.643 /LCY Total job cost: $469,978 <br />CIRCES Cost Estimating Software <br />